Log in
Forum
Topic

Automatic Credits for tenant improvement in new LEED Silver bldg

CI-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Judy Peterson on Sep 2, 2009, 12:36 pm

Are there credits which can automatically be taken for a tenant improvement project in a building which is LEED Silver under v2 of Shell and Core?

Last reply: Devon Bertram, Sep 8, 2009, 3:02 pm

EAp2

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Jean Marais on Sep 11, 2009, 11:44 am

"Achieve skylight roof coverage between 3% and 6% of the...

Last reply: Jean Marais, Sep 11, 2009, 11:49 am

Working through the rational

NC-2009 SSc6.1: Stormwater design - quantity control
posted by Jean Marais on Sep 17, 2009, 4:42 am

Working through the rational method, I've calculated the Time of Concentration (Tc), then itterated using IDF (intensity-duration-frequency) charts until the duration = time of concentration (...

20% not a gimme any more

NC-2009 WEp1: Water Use Reduction
posted by Bill Swanson on Aug 11, 2009, 8:33 am

Not sure if anyone noticed but the new WE prereq now uses 0.5 gpm for the baseline of restroom lavatories. This will make the mandatory 20% savings more of a challange. These are my calcs on the...

Last reply: Brenden McEneaney, Sep 17, 2009, 6:41 pm

Demonstrating LPD Compliance

NC-2009 SSc8: Light Pollution Reduction
posted by Dean Ralphs on Sep 23, 2009, 5:41 pm

Can I use the ASHRAE table and methodology of demonstrating...

Points available for EQ pr2 (ETS control)?

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by jeff gaines on Sep 24, 2009, 2:49 pm

Are their points available for over achieving on this prerequisite (...

No extra points available for EQp2

NC-2009 IEQp2: Environmental Tobacco Smoke (ETS) Control
posted by Lauren Sparandara on Sep 25, 2009, 6:14 pm

Hi Jeff,
Sorry, no such luck. What you're looking for is an "exemplary performance" option that would let you earn an innovation point, but those don't exist for prerequisites. You can...

Prescriptive Method Comments

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Carly Ruggieri on Sep 29, 2009, 2:06 pm

If a 'Daylight Zone' does not qualify, the advice in the documentation toolkit on this website suggests reducing the SF of the floor area in the equation until you can determine the area that is...

Is this a typo?

CS-2009 MRc6: Certified Wood
posted by Nick Hentschel on Sep 28, 2009, 4:52 pm

This is the same text as the MRc7 credit for CS, Schools, etc., while there's another MRc6 credit right alongside it. Do we have an error here?

Last reply: Tristan Roberts, Sep 29, 2009, 2:15 pm

Creating the Floor Plan to show direct access to views

Schools-2009 IEQc8.2: Daylight and views - views
posted by Kim Pomeranz on Oct 8, 2009, 2:16 pm

I still don't quite understand how those lines are determined on the floor plan? Do i take a line at a 45 degree angle from the center point of each window? Where they intersect I'm assuming is...

Last reply: Joshua Lloyd, Oct 8, 2009, 3:15 pm