Topic

Can gas metering only qualify for EAc3.2?

EBOM-2009 EAc3.2: Performance measurement - system-level metering
posted by James Doyle on Oct 28, 2013, 1:23 pm

Under LEED EBOM...

Last reply: Hannah Bronfman, Nov 7, 2013, 3:42 pm

Mixed use meter

EBOM-2009 EAc3.2: Performance measurement - system-level metering
posted by Alicia Villanueva on Feb 5, 2013, 11:59 am

We have a meter that measures: chiller + pump + lighting system.

Since we are not discriminating by "end use": would this meter qualify towards this credit?

Thanks

GH

Last reply: Ben Stanley, Aug 14, 2013, 5:31 pm

Period & time of Breakdown

EBOM-2009 EAc3.2: Performance measurement - system-level metering
posted by Alexa Stone on Mar 13, 2013, 5:13 pm

Hi all, I'm confused about when OR over what period of time does the breakdown need to capture. I understand that it needs to roll up to the EAc1 declared annual energy use (mbtu). Does that mean...

Last reply: Hannah Bronfman, Jul 31, 2013, 12:13 pm

Airflow metering

EBOM-2009 EAc3.2: Performance measurement - system-level metering
posted by Tapio Peltonen on Oct 12, 2012, 7:46 am

Our project building has central air-handlers, which provide heating and cooling for the tenant spaces i.e. heating and cooling by air only. Do we need to install airflow meters in each tenant...

Last reply: Hannah Bronfman, Oct 16, 2012, 9:02 am

EAp2/c1 Metering Requirements Also Earn EAc3.2?

EBOM-2009 EAc3.2: Performance measurement - system-level metering
posted by American University on Feb 2, 2012, 5:13 pm

If we had to meter things like hot water usage and chillers on a building level to comply with EAp2/c1 to do building-level metering of all incoming energy inputs, would we automatically be able...

Last reply: American University, Sep 28, 2012, 5:02 pm

Tenant Electricity Meters

EBOM-2009 EAc3.2: Performance measurement - system-level metering
posted by Mitch Gascoyne on Jul 18, 2011, 2:39 pm

Does anyone have any experience with tenant sub-metering and compliance with this credit? The sub-meters will be arranged to monitor the lighting and plug load energy use of each suite...

Last reply: Hannah Bronfman, Feb 16, 2012, 5:33 pm

What to do?

EBOM-2009 EAc3.2: Performance measurement - system-level metering
posted by Paola Figueiredo on Oct 6, 2011, 4:04 pm

Our project team is working on LEED...

Last reply: Hannah Bronfman, Feb 16, 2012, 5:28 pm

Commercial Building with Tenant spaces fully submetered

EBOM-2009 EAc3.2: Performance measurement - system-level metering
posted by Energy Spectrum on Feb 14, 2012, 2:15 pm

I am wondering if a commercial building, where over 90% of the building is submetered tenant space would qualify for this credit. There are separate submeters for the tenants plug load/lighting...

Last reply: Hannah Bronfman, Feb 16, 2012, 5:16 pm

Interpretation doubt

EBOM-2009 EAc3.2: Performance measurement - system-level metering
posted by Carolina Vergnano on Nov 29, 2011, 5:55 am

Hello,
I've got a doubt about the time that we should develop the breakdown of energy.
The guide says: "This analysis of major energy-use categories must have been conducted within 2...

Last reply: Christopher Schaffner, Nov 29, 2011, 6:40 am

Instantaneous and/or totalized

EBOM-2009 EAc3.2: Performance measurement - system-level metering
posted by James Gray on Jul 6, 2011, 2:26 pm

For natural gas metering applications, is continuous logging of instantaneous flows a requirement? Most meters just put out totalized pulses, so I'm assuming that's fine...

Any thoughts?...