Topic | Recent |
---|---|
Interior Reuse- shared walls with other businessesCI-v4 MRc2: Interiors life-cycle impact reductionposted by Lou Niles II on Jun 27, 2019, 2:05 pm
Hello Can anyone give some advice on including Both sides or one side of interior walls for a Tenant Improvement where the other side of the wall is a space not in the scope. The other side of... |
|
Replacement for the demolished wallsCI-v4 MRc2: Interiors life-cycle impact reductionposted by Simon Sue on May 15, 2018, 12:08 am
In a CI tenant finish-out, if existing interior partitions are demolished and new interior partitions are constructed in an original configuration (not matching to the demolished partition layout... Last reply: Tracy Marquis, Mar 19, 2019, 3:46 pm |
|
Reuse furniture costCI-v4 MRc2: Interiors life-cycle impact reductionposted by pradeep kumar on Mar 12, 2019, 2:13 am
We are doing the project in which our client reusing the furniture from their existing office to the new office. Furniture comprises of wooden tables, chairs etc. How could we identify the cost... |
|
How to demonstrate the materials are reusable or recycable?CI-v4 MRc2: Interiors life-cycle impact reductionposted by Ameet AA on Feb 26, 2019, 9:55 pm
The LEED language reads: Ensure that at least 50% of nonstructural materials, by cost, are reusable or recyclable, as defined by the Federal Trade Commission Guide for Use of Environmental... |
|
Furniture Reuse vs. Building Product Disclosure and Optimization— Sourcing of Raw Materials "Materials Reuse"CI-v4 MRc2: Interiors life-cycle impact reductionposted by Kristen Magnuson on Feb 13, 2019, 2:00 pm
Hello LEED world, Option 2 of this credit grants 1 point if you "Reuse, salvage, or refurbish... Last reply: Alara Brinton, Feb 15, 2019, 1:50 pm |
|
Tracking re-used materials- Exterior walls.CI-v4 MRc2: Interiors life-cycle impact reductionposted by Kerry Honsinger on Aug 8, 2016, 7:04 pm
We are working on a building where the exterior walls are going to be changed very little. I have a question about the '3 layers" and the "SCOPE OF WORK". The entire building is in the scope... Last reply: Kristi Ennis, Jan 28, 2019, 3:30 pm |
|
Option 1. interior reuseCI-v4 MRc2: Interiors life-cycle impact reductionposted by DAVE LI on Nov 30, 2018, 12:59 am
I have space is use the glass for the compartment. Is this belong Interior wall partition? |
|
Flexible Power DistributionCI-v4 MRc2: Interiors life-cycle impact reductionposted by roma goyal on Jun 28, 2018, 8:13 am
Hello, I would like to know e=waht does 'flexible power distribution i.e. plug and play system' mean? what are the equipments to be considered for this system? what... Last reply: Raphael Sperry, Aug 22, 2018, 6:50 pm |
|
Option 3. design for flexibility- Acessible ceiling systemCI-v4 MRc2: Interiors life-cycle impact reductionposted by Lara Branco on Jul 10, 2018, 9:05 pm
The project I'm working on will leave all the ceiling infrastructure apparent, without the use of ceiling tiles (except a few acoustic panels). Therefore all the lighting, plumbing, etc. that are... |
|
Accessible Floor and Ceiling systemCI-v4 MRc2: Interiors life-cycle impact reductionposted by roma goyal on Jun 26, 2018, 5:04 am
Hello, I would like to know what does "accesible floor and ceiling system" mean? Does it mean suspended ceiling system and raised floor system for 50% of the total floor area. ... |