Warehouse renovation: insulation required per ASHRAE 90.1-2010?

NC-v4 EAp2: Minimum Energy Performance
posted by Alessandro Zuanon on Jan 28, 2021, 5:11 am

times on these forums. Specifically it says- 5.4.1 Insulation. Where insulation is required in Section 5.5 or 5.6, it shall comply with the requirements found in Sections 5.8.1.1 through 5.8.1.9....

Last reply: Alessandro Zuanon, Jan 28, 2021, 10:35 am

Different stratification in Proposed and Baseline

NC-v4 EAp2: Minimum Energy Performance
posted by Przemysław Rejczak on Jan 26, 2021, 12:34 pm

Dear Everyone,

I have a question regarding to 12 m tall warehouse modeling tehnique.

Such building will have a huge temperature gradient which is crucial for the energy efficiency...

Last reply: Marcus Sheffer, Jan 26, 2021, 1:39 pm

ASHRAE 90.1-2010 Mandatory Requirements in Existing Buildings

NC-v4 EAp2: Minimum Energy Performance
posted by Lauren Baumann on Oct 15, 2015, 10:21 am

EAp2 requires adherence to ASHRAE 90.1-2010 Mandatory Requirements at Section 5.4 and elsewhere. For an existing masonry building on a zero lot line, the R-11.4 continuous insulation required...

Last reply: Marcus Sheffer, Jan 25, 2021, 10:48 am

Newbie Looking for guidance on completing the Minimum Energy Performance Calculator

NC-v4 EAp2: Minimum Energy Performance
posted by Nelson Cepeda on Jan 21, 2021, 9:52 am

Q: Where do I find the Equivalent Full Load Hours of Operations Per Year values to put in the corresponding cells, such as for Interior Light, Service Water Heating, etc...to place on the...

Last reply: Marcus Sheffer, Jan 22, 2021, 6:07 pm

MERV 8 + MERV 14 Filters Pressure Drop Credit of Precool AHU (PAHU) in Baseline

NC-v4 EAp2: Minimum Energy Performance
posted by Thiag B on Jan 21, 2021, 11:41 pm

When PAHU (...

ASHRAE 90.1-2010 VS. MLO lighting zone

NC-v4 EAp2: Minimum Energy Performance
posted by Nuttanee Vongveeranonchai on Feb 12, 2019, 9:32 am

I am working on a project locating on a commercial corridor of a capital city. Per the MLO lighting zone, my project should be in Lighting Zone 3 since MLO allows only a case like New York’s Time...

Last reply: Nuttanee Vongveeranonchai, Jan 13, 2021, 9:34 pm

Separate buildings with common basement

NC-v4 EAp2: Minimum Energy Performance
posted by Nikos Tsitsikas on Jan 8, 2021, 10:42 am

Hi all,

We are working on a project that consists of two separate buildings (different project ID) on a campus site. Those two buildings would be totally separated with the exception of...

Last reply: Marcus Sheffer, Jan 8, 2021, 1:25 pm

Exterior Building Lighting façade- MANDATORY PROVISIONS ASHRAE 90.1- 2010

NC-v4 EAp2: Minimum Energy Performance
posted by Sara ALIA YOUSSOUFI on Dec 21, 2020, 7:52 am

We are currently developing a large-scale lighting project for which we need to clear up some doubts about ASHRAE 90.1 regulations – section 9.4 – 2010 regarding exterior facade lighting.

...

Last reply: Marcus Sheffer, Dec 28, 2020, 12:48 pm

Passive House Certification

NC-v4 EAp2: Minimum Energy Performance
posted by Matthew Kaplan on Dec 17, 2020, 1:18 pm

We have a school project that is considering both PHIUS certification and LEED certification. I found ID #10486 which allows multifamily projects to use PHI/PHIUS certification to demonstrate...

Last reply: David Posada, Dec 23, 2020, 5:24 pm

Modeling only conditioned area

NC-v4 EAp2: Minimum Energy Performance
posted by Omar Elrawy on Dec 9, 2020, 10:05 pm

I'm certifying a huge factory with an attached office building. Is it possible to model only the office area?
The factory is high on process loads, which will make it impossible to achieve...

Last reply: Marcus Sheffer, Dec 14, 2020, 5:15 pm