Topic | Recent |
---|---|
Reused element in either structure or enclosureNC-v4.1 MRc1: Building life-cycle impact reductionposted by Maria Porter on Feb 22, 2021, 3:45 am
Option 2, path 4 – LCA. “….and incorporate... Last reply: Maria Porter, Mar 7, 2022, 3:45 am |
|
Can a regional soil be the reference soil instead of the existing soil on the siteCS-v4 SSc2: Site development - protect or restore habitatposted by Hanna Oberg on Sep 8, 2020, 1:01 am
We have a project with existing green areas. The existing soil is some type of mud soil not suitable for the new green areas. The project will import new soil, typical soil for the region, for... Last reply: Cecile de Villemeur, Nov 25, 2021, 1:49 pm |
|
Walkscore only for a few countries?NC-v4.1 LTc4: Surrounding density and diverse usesposted by Maria Porter on Feb 25, 2021, 5:19 am
I investigated the new option 3 for this credit. The only information required is a screenshot of the Walkscore. That seems a lot easier than showing... Last reply: Ryan Hussey, Oct 8, 2021, 12:13 pm |
|
Definition of ”Housing” in Diverse UsesNC-v4 LTc4: Surrounding density and diverse usesposted by Maria Porter on Sep 20, 2021, 5:28 am
One use type is “Community anchor uses - Housing (100 or more dwelling units)”. In one project I used a large area of single family houses, all within tha right distance, for... Last reply: Bipin Karki, Sep 21, 2021, 8:19 am |
|
Wood decking on roofCS-v4 SSc5: Heat Island Reductionposted by Maria Porter on Sep 21, 2021, 8:04 am
Has anybody had success in getting an... |
|
Glare control requirements for Nordic projectsNC-v4.1 EQc7: Daylightposted by Medina Deliahmedova on Sep 14, 2021, 11:53 am
Dear All, I am an engineer at Inform Design (consulting practice based in Sweden), and we are working on a large office building project which aims to acquire LEED certificate. I... |
|
Does the paring now have to be on-site?CS-v4.1 LTc8: Electric Vehiclesposted by Maria Porter on Aug 12, 2021, 4:19 am
I have had many projects in v2009 that have had their parking in a neighboring garage if they don’t have their own garage. I have ongoing projects in v4 with the same situation. But somebody just... Last reply: Maria Porter, Aug 12, 2021, 4:23 am |
|
Wind-PPA as renewable energy production?NC-v4 EAc5: Renewable energy productionposted by Lai-San wong on Jun 13, 2017, 5:19 am
Hi! Last reply: Christopher Schaffner, Apr 8, 2021, 8:57 am |
|
Is there or is there not an EP for this credit?NC-v4.1 EQc8: Quality Viewsposted by Maria Porter on Mar 31, 2021, 6:50 am
Can I assume that the Exemplary Performance level of >90 % regularly occupied spaces with views is still relevant in v4.1 (both pre and post Nov 2020 update), referring to the text: “Guidance... |
|
Green Cleaning PolicyEBOM-v4.1 EQp3: Green Cleaning Policyposted by Hanna Oberg on Mar 29, 2021, 5:29 am
Hi I have a project where the tenant are responsible for the cleaning of every areas in the building, hence the property owner does not have any contracted cleaning for this specific... |