Log in
Forum » Spain
Topic

locker roms

Pilot-Credits WEpc147: All-Gender Restrooms
posted by Belén Palao on Apr 27, 2022, 12:45 pm

Paula Melton Editorial Director BuildingGreen, Inc. LEEDuser Moderator 180 thumbs up April 28, 2022- 11:21 am Hi, Miguel! I'm hoping someone on here might have an answer for you. However, just keep in mind that posting to LEEDuser is not the same as writing to LEED Coach. This is an independent grassroots forum. The email for LEED Coach is leedcoach@usgbc.org. Log in or register to post comments Zeynep Cakir LEED AP BD+C, WELL AP, Sustainable Building Consultant ECOBUILD LEEDuser Basic Member 10 thumbs up March 13, 2023- 9:12 am Dear Miguel, Have you received any feedback from the LEED...

Last reply: Vanessa Hostick, Aug 14, 2023, 12:05 pm

Ventilation Warehouses

NC-v4 EQp1: Minimum indoor air quality performance
posted by Helena Garcia on Jun 20, 2016, 4:12 am

We are certifing a project with two buildings, the first is an offices, the second is a warehouses to rent in Spain.
The question is for the warehouse, this warehouse is not conditioned...

Last reply: Emma Loris, Jul 26, 2023, 12:28 am

Ventilation in corridors

NC-v4 EQp1: Minimum indoor air quality performance
posted by Luana Jerez on Jul 18, 2023, 9:30 am

We are working on an office building 17 meters wide, on one floor, the layout is a 3.5-meter distribution corridor, serving as a division between two rows of offices. These offices are equipped...

Ratio Windows/Wall in baseline model Table G1.1.1-1

NC-v4.1 EAp2: Minimum Energy Performance
posted by Marc Maso on Jun 23, 2021, 12:10 pm

Dear Srs, I hace a question about the ratio windows/walls in leed v4.1. Is for a building with two differents uses: 3.117 m2 of office and 13.472m2 of warehouse.

When we had modeled the...

Last reply: Mark Terpstra, May 31, 2023, 4:40 pm

NC vs Schools

LEED Rating System Selection
posted by Alberto Belinchon Jimenez on Apr 11, 2023, 9:47 am

I have a client (university) that is certifying a couple of buildings with another company and they are doing it as BD+C: NC. However, they have contracted us for a new classroom building and we...

Last reply: Summer Minchew, Apr 25, 2023, 9:50 am

LEED v4.1 ID+C: HOSPITALITY

Hospitality-NC-v4.1 LTc4: Surrounding density and diverse uses
posted by JORDI CASTELLANO on Mar 30, 2023, 3:18 am

Dear all,

I have a question related in the Option 3 in LT Credit:Surrounding Density and Diverse Uses.

In the Walk Score's web there are no result options in Spain. How can I...

Last reply: Deborah Lucking, Mar 31, 2023, 12:16 pm

Project Boundary

Healthcare-v4.1 LTc2: Sensitive land protection
posted by Jordi Castellano on Feb 13, 2023, 10:29 am

Good afternoon,

According to the LEED v4.1 handbook, if we locate the project on land where it was already developed, but our project goes a little over the boundaries, do we have to get...

Last reply: Dave Hubka, Feb 15, 2023, 1:23 pm

Major Renovation

CS-v4 EAp2: Minimum Energy Performance
posted by Helena Garcia on Jan 30, 2023, 9:55 am

Dear LEED users, 

We are working in a renovation project which design a new envelope. This new design defines different project floor areas.

According to AppendixG-TableG3.1.5...

Last reply: Marcus Sheffer, Jan 30, 2023, 6:56 pm

Electric vehicles supply equipments

CS-v4.1 LTc8: Electric Vehicles
posted by Helena Garcia on Nov 7, 2022, 7:44 am

Would it be possible to count electric motorcycles as electric vehicles as well? Or, as electric vehicles, only cars and vans are valid?

Entryway system and fire security

Warehouses-NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Helena Garcia on Jan 16, 2017, 11:30 am

The project is a warehouse divided in two parts: storage and offices. For to achieve this credit it applies entryway system which have to be a special carpet of 3 meters long, continuous and...

Last reply: Soha ElYamany, Oct 17, 2022, 10:02 am