Topic | Recent |
---|---|
Differences between Baseline and Proposed energy modelCI-v4 EAp2: Minimum Energy Performanceposted by Irina Lugo on Apr 2, 2024, 9:57 am
Hi everyone, sorry if this is a bit obvious, it is my first time working with this type of LEED certification. I am working on a refurbishment project for an office space, I have made my energy... Last reply: Marcus Sheffer, Apr 5, 2024, 8:48 am |
|
Emissions for a District System in the Minimum Perfomance CalculatorRetail-CI-v4.1 EAp2: Minimum Energy Performanceposted by Marc Maso on Dec 16, 2023, 6:43 am
Hello, I have a building with a district system for cooling, heating and... |
|
Take into account Renewable Energy production in the close future from the certificationCI-v4 EAp2: Minimum Energy Performanceposted by Helena Garcia on Nov 21, 2023, 10:02 am
Dear... Last reply: Dave Hubka, Nov 27, 2023, 12:11 pm |
|
Existing building and extension building in one certificationNC-v4 MPR2: Must use reasonable LEED boundariesposted by Helena Garcia on Nov 13, 2023, 5:35 am
In our team we are conducting a study for the construction of an extension of an existing building. Last reply: Dave Hubka, Nov 13, 2023, 9:09 am |
|
Timber lattice roofNC-v4 SSc5: Heat Island Reductionposted by Jose Miguel Gonzalez on Jul 18, 2023, 4:12 am
Hi everyone, For the calculation of the heat island on the roof of a building, we have an open terrace where a part of it is covered by a wooden lattice... Last reply: emily reese moody, Sep 25, 2023, 7:43 pm |
|
locker romsPilot-Credits WEpc147: All-Gender Restroomsposted by Belén Palao on Apr 27, 2022, 12:45 pmPaula Melton Editorial Director BuildingGreen, Inc. LEEDuser Expert 183 thumbs up April 28, 2022- 11:21 am Hi, Miguel! I'm hoping someone on here might have an answer for you. However, just keep in mind that posting to LEEDuser is not the same as writing to LEED Coach. This is an independent grassroots forum. The email for LEED Coach is leedcoach@usgbc.org. Log in or register to post comments Zeynep Cakir LEED AP BD+C, WELL AP, Sustainable Building Consultant ECOBUILD LEEDuser Basic Member 14 thumbs up March 13, 2023- 9:12 am Dear Miguel, Have you received any feedback from the LEED... Last reply: Vanessa Hostick, Aug 14, 2023, 12:05 pm |
|
Ventilation WarehousesNC-v4 EQp1: Minimum indoor air quality performanceposted by Helena Garcia on Jun 20, 2016, 4:12 am
We are certifing a project with two buildings, the first is an offices, the second is a warehouses to rent in Spain. Last reply: Emma Loris, Jul 26, 2023, 12:28 am |
|
Ventilation in corridorsNC-v4 EQp1: Minimum indoor air quality performanceposted by Luana Jerez on Jul 18, 2023, 9:30 am
We are working on an office building 17 meters wide, on one floor, the layout is a 3.5-meter distribution corridor, serving as a division between two rows of offices. These offices are equipped... |
|
Ratio Windows/Wall in baseline model Table G1.1.1-1NC-v4.1 EAp2: Minimum Energy Performanceposted by Marc Maso on Jun 23, 2021, 12:10 pm
Dear Srs, I hace a question about the ratio windows/walls in leed v4.1. Is for a building with two differents uses: 3.117 m2 of office and 13.472m2 of warehouse. When we had modeled the... Last reply: Mark Terpstra, May 31, 2023, 4:40 pm |
|
NC vs SchoolsLEED Rating System Selectionposted by Alberto Belinchon Jimenez on Apr 11, 2023, 9:47 am
I have a client (university) that is certifying a couple of buildings with another company and they are doing it as BD+C: NC. However, they have contracted us for a new classroom building and we... Last reply: Summer Minchew, Apr 25, 2023, 9:50 am |