Log in
Forum » Denmark
Topic

Commercial washing mashines i EU

NC-v4 WEp2: Indoor water use reduction
posted by Lise Dannesboe on Aug 21, 2018, 4:10 am

Hi.

Have anyone found a commercial washing maschine in Europe, which meets the CEE TIER 3A requirements, and which can be documented? Miele can delivere a commerical washing maschine,...

Last reply: Peggy Brock, Nov 20, 2018, 10:49 am

Glycol for anti-freeze

NC-v4 EAc6: Enhanced Refrigerant Management
posted by Lise Dannesboe on Jun 1, 2018, 10:20 am

Hi

In Denmark our chillers are located at the roof, where there in the winter is a risk of freezing. The refrigerant in the cooling units are ammonia.

I have not been able to find...

How wide is the definition of coating?

CI-v4 EQc2: Low-emitting materials
posted by Rita Paulo on Jan 24, 2018, 3:17 am

Hi everyone.

We are checking the project written material of a LEED V.4. BD+C project in Copenhagen.

The developer chose the Option 1 of Low-emitting material credit and we only...

Last reply: Rita Paulo, Jan 26, 2018, 5:24 am

Waste-to-Energy

NC-v4 MRc5: Construction and demolition waste management
posted by Lise Dannesboe on Jan 9, 2018, 4:06 am

to energy facilities." The credit form has a text box for your explanation. Lastly, I hope you saw this forum-  https://leeduser.buildinggreen.com/forum/incineration-option-diversion-m... Log...

Last reply: RETIRED, Jan 9, 2018, 1:27 pm

WEc2- Indoor Water- waterflow

NC-v4 WEc2: Indoor water use reduction
posted by Lise Dannesboe on Dec 20, 2017, 9:51 am

Hi.

The LEED Baseline for public lavatory faucets is 1.9 lpm, which seem very low compare to what is on the marked in Denmark. But is actually do to the 30 sec. duration - so the actual...

Last reply: Lise Dannesboe, Dec 20, 2017, 10:36 am

When is the building considered occupied?

NC-2009 EAc3: Enhanced Commissioning
posted by Lise Dannesboe on Dec 5, 2017, 4:22 am

Hi. For the 10 month post-occupancy...

Last reply: Scott Bowman, Dec 5, 2017, 1:56 pm

Measurement period

NC-2009 EAc5: Measurement and Verification
posted by Lise Dannesboe on Dec 5, 2017, 4:35 am

Hi.

we willa s minimum share 1 year of monthly energy consumptions with USGBC, but when should this periode start? People are moving into the building, but it is not fully occupied and we...

Last reply: Marcus Sheffer, Dec 5, 2017, 9:04 am

Painting

CS-2009 SSc7.1: Heat island effect - nonroof
posted by Lise Dannesboe on Nov 13, 2017, 2:22 am

Hi - is it possible to paint the pavement to get the wanted...

Distance between bicycle storage and bicycle network

NC-v4 LTc6: Bicycle facilities
posted by Lise Dannesboe on Oct 19, 2017, 6:26 am

Hi.

"Design or locate the project such that a functional entry or bicycle storage is within a 200-yard (180-meter)...

Last reply: Calie Gihl, Nov 7, 2017, 3:48 pm

Labelling of waste containers

NC-v4 MRp2: Construction and demolition waste management planning
posted by Lise Dannesboe on Oct 18, 2017, 5:01 am

Hi.

A quick question, which I have not been able to find an answer to in the LEED manual. When labelling our waste containers is it a LEED requirement that it must be in english or is it...

Last reply: Kristina Bach, Oct 18, 2017, 8:30 am