How to cal kw/cfmEBOM-v4.1 EAp3: Energy Performanceposted by Oatto Promsrisawat on Jan 29, 2020, 5:57 am
good morning every body as 1. I have input motor on specification 442 Watts (it include power factor or not) 2. I have cfm 1333 cfm 442/1333 = 0.33 watts/cfm (it correct or... |
|
LCA Boundary ConditionNC-v4 MRc1: Building life-cycle impact reductionposted by Thanyatorn Khumpairoj on Dec 3, 2018, 1:43 am
I have questions about the whole building life cycle assessment (LCA). Why baseline is so open? According to ASHRAE 90.1, Do we use only for... Last reply: Rodrigo Castro, Dec 4, 2018, 2:02 am |
|
District pumping energy consumptionND-v2009 GIBc12: District heating and coolingposted by Vincent Dupuy on Sep 26, 2018, 4:52 pm
Hello, GIBc12 - District heating and cooling requires that "annual district pumping energy consumption that exceeds 2.5% of the annual thermal energy output of the heating and... Last reply: Eliot Allen, Oct 14, 2018, 2:32 pm |
|
No MERV 13 in minor occupancy areaCS-v4 EQc1: Enhanced indoor air quality strategiesposted by sompoche sirichote on Feb 21, 2018, 5:48 am
Hi, Our project is a high-rise office tower with a small podium in front of the project. Our office tower has 55 storey. The podium is open air space where has small enclosed retail and... |
|
Smoking Cabin in Parking BuildingRetail-CI-v2009 IEQp2: Environmental Tobacco Smoke (ETS) Controlposted by sompoche sirichote on Nov 16, 2017, 3:34 am
Our project is retail store with parking building block attached. Problem is our space is limited to provide smoking area in open air and we cannot provide smoking room due to law. Anyway, we... |
|
Preferred Parking both inside and outside LEED boundaryNC-2009 SSc4.4: Alternative transportation - parking capacityposted by sompoche sirichote on Jun 29, 2017, 12:35 am
Our project is factory expansion and our client purchase a new land nearby for parking facilities. Last reply: Tristan Roberts, Aug 26, 2017, 5:46 pm |
|
Project size extended in the middle of constructionNC-2009 MPR4: Must comply with minimum floor area requirementsposted by wachira sosaeng on Apr 15, 2017, 4:11 am
My project registered for LEED 2009, mixed use building with 2 towers on the same podium. At first the project registered for LEED only 1 tower but later on the owner decided to registered for... Last reply: Tristan Roberts, Aug 26, 2017, 5:03 pm |
|
Elevated buggy paths qand bridges for resort projecctNC-2009 SSc7.1: Heat island effect - nonroofposted by John Covello on Jun 21, 2017, 3:01 am
Hello, I am dealing with a hotel project that will have elevated buggy paths connected to buildings for a second and third tier of buildings. Does the elevated buggy path area and the... Last reply: Simon Sue, Jul 17, 2017, 5:10 am |
|
Single certification for physically distinct structuresNC-v4 MPR2: Must use reasonable LEED boundariesposted by NAMRATA GUPTA on May 21, 2017, 7:34 am
We are pursuing LEED for a hotel cum resort project with 80 individual villas plus main admin block, spa block, utlity blocks etc. None of the buildings have an area of more than 25,000 square... Last reply: Tristan Roberts, Jul 7, 2017, 4:17 pm |
|
Project size extended in the middle of constructionNC-v4 MPR3: Must comply with project size requirementsposted by wachira sosaeng on Apr 13, 2017, 12:07 pm
My project registered for LEED 2009, mixed use building with 2 towers on the same podium. At first the project registered for LEED only 1 tower but later on the owner decided to registered for... Last reply: Daniel Hartsig, May 30, 2017, 1:12 pm |