Topic | Recent |
---|---|
LED Wall washer calculationLEED v4.1 Discussion Forumposted by Martina Vázquez on Feb 1, 2023, 6:35 am
Good morning, I've been studing LEED v4.1 document and it is almost all of it for streetlight projects, but we have a proposal based in wall-washer the exterior facade. I don't really know... |
|
System 2 as the baseline system for the whole projectNC-v4 EAp2: Minimum Energy Performanceposted by Amal Venugopal on Jan 21, 2023, 8:29 pm
We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA. Greetings!... We have a question regarding the... Last reply: Marcus Sheffer, Jan 27, 2023, 2:01 pm |
|
Resort: Baseline HVACNC-v4 EAc2: Optimize Energy Performanceposted by Amal Venugopal on Jan 23, 2023, 3:07 am
Greetings!... We are doing the energy model for one of our projects. This project is a luxurious resort with LGF, GF, 1F & 2F will be located in KSA. We have a question... Last reply: Marcus Sheffer, Jan 27, 2023, 2:00 pm |
|
Are substations registered within a LEED project?LEED Guidance for Campuses and Multiple Buildingsposted by Dalia Abdalla on Jul 28, 2022, 2:09 am
Do we need to register substations within a project as separate buildings (Under Group Approach) ? If yes, do we have to consider them for analysis under each credit. They don't have any GFA. ... |
|
Uplights in an LZ0 zoneNC-v4.1 SSc6: Light Pollution Reductionposted by Ellis John Mandia on Apr 11, 2022, 8:36 am
Can the percentage values prescribed in the "Maximum allowed percentage of total luminaire lumens emitted above horizontal" be taken as time-related? For example, if we have uplights in a LZ0... Last reply: Bill Swanson, Apr 21, 2022, 9:13 am |
|
LEED Campus V4 MatrixLEED Guidance for Campuses and Multiple Buildingsposted by sana salman on Apr 18, 2022, 7:05 am
Hello , Does anyone have LEED v4 campus matric for BD+C. I downloaded LEED guidance for Campus but it has credits and Matrix for LEED 2009. also can i register the campus with... Last reply: Erin Holdenried, Apr 18, 2022, 9:55 am |
|
Fire alarm cables (Public Address system) in the hospitalsHealthcare-v4 MRc6: PBT source reduction - lead, cadmium and copperposted by Najam Us Saqib on Apr 7, 2022, 2:54 am
Fire alarm cables are same like electrical cables, however, its function is different. The v4 LEED guide uses the words ''Electrical wiring and cabling'' under Lead requirements (... |
|
GHG Emission Factor for Saudi ArabiaNC-v4.1 EAp2: Minimum Energy Performanceposted by Kathy Wong on Feb 17, 2022, 8:43 pm
We are trying to figure out the... Last reply: Tyler Thumma, Mar 3, 2022, 10:25 am |
|
GREY WATER USADGENC-v4.1 WEp2: Indoor water use reductionposted by FRAN HERRERA on Nov 8, 2021, 3:17 am
Hi dear mates, I need to add grey water usadge to Indoor water use reduction credit. According to my calculation 100 % of the WC flush water would be reused from showerhead and sinks. ... Last reply: emily reese moody, Nov 18, 2021, 1:07 pm |
|
ASHRAE 90.1 2016- Mandatory Provisions- Workers` Accommodation BuildingNC-v4.1 EAp2: Minimum Energy Performanceposted by Amgad Khattab on May 3, 2021, 5:56 pm
We have a Workers` accomdination building which mainly comprimes of 3 floors and each floor has 32 room. Each room has 2 single bedrooms. Whie checking complying with ASHRAE 90.1 2016 - Mandatory... Last reply: Marcus Sheffer, May 3, 2021, 6:45 pm |