Topic | Recent |
---|---|
Painting or Coating for Steel StructureCS-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Ali Soufan on Sep 10, 2015, 1:28 pm
Hi Last reply: Jon Clifford, Jan 30, 2016, 10:51 pm |
|
Supply fixtures to tenants without installationCS-2009 WEp1: Water Use Reductionposted by Ali Soufan on Jun 9, 2015, 2:24 am
Would it be possible to claim performance improvement by supplying the toilet fixtures for all tenants without installing them? Last reply: Tristan Roberts, Jan 22, 2016, 11:45 am |
|
OPR for LEED NDGeneral forumsposted by Philippa Cameron on Mar 30, 2015, 7:02 am
Looking through the requirements of LEED ND v4 I can only find reference to the... Last reply: Casey Studhalter, Apr 1, 2015, 2:18 pm |
|
Occupancy ProofNC-2009 WEp1: Water Use Reductionposted by Deepika Parmar on Mar 22, 2015, 4:23 am
What is the documented proof required to be submitted to USGBC confirming on the Occupancy considered for our project. Will a letter from the client confirming on the... Last reply: Deepika Parmar, Mar 30, 2015, 3:09 am |
|
LEED ND with Buildings Under ConstructionGeneral forumsposted by Philippa Cameron on Mar 16, 2015, 5:32 am
If a site has a number of buildings already under construction and substantially complete, the design for most of which does not consider LEED requirements, and the client decides to pursue LEED... Last reply: Philippa Cameron, Mar 17, 2015, 2:20 am |
|
Email as Client Letter of CommitmentGeneral forumsposted by Nandan Tavkar on Mar 11, 2015, 5:41 am
Can client's emails be used in place of letter of commitment form client? Does USGBC accept emails as evidence? |
|
LEED boundary for a railway stationNC-2009 PIf1: Minimum Program Requirementsposted by Juan Sergio Simborio on Feb 28, 2015, 9:12 am
LEED NC 2009 Our project is a major railway station in Qatar. The shape of the... |