Baseline system selection for data center project above 1,50,000 sqft of area.Data-Centers-NC-v4 EAc2: Optimize Energy Performanceposted by Rameez Lal on Jul 19, 2022, 4:52 am
I have came across a paper which says even if the white spaces(data halls) in a data centre building constitute the majority area of the project, the system selection for white spaces can be... Last reply: Tyler Thumma, Aug 11, 2022, 10:41 am |
|
Indoor Water Usage Prerequisite RequirementsCI-v4 WEp1: Indoor water use reductionposted by rakesh bhatia on Aug 12, 2020, 3:41 am
In the reference guide of LEED ID+C V4, it is mentioned under prerequisite the newly installed plumbing fixtures must be according to the Table 6 flow rates. The % savings must be shown for... Last reply: emily reese moody, Jun 15, 2022, 5:29 pm |
|
Ventilation design-worst case conditionsCI-2009 IEQp1: Minimum indoor air quality performanceposted by S Nagarajan on Jan 23, 2015, 10:17 am
How to provide a narrative to explain how the worst-case condition was determined considering the total design airflow rate at the condition analyzed Last reply: Apoorva Pradhan, Nov 19, 2021, 1:15 pm |
|
LPG Gas Connection and Usage in the LEED certified building.NC-2009 EAc3: Enhanced Commissioningposted by Selvam C on Apr 30, 2021, 12:14 am
Dear Team, Greeting to everyone, We need to understand about the LEED process and procedure / guidelines of the LPG Gas or Cooking Gas services and usage for the LEED certified... |
|
SRI Value from the Test CertificateNC-2009 SSc7.2: Heat island effect - roofposted by Nandana Kumar on Dec 10, 2015, 4:52 am
Hello, Whenever we receive a... Last reply: Arthika Saseendranath, Jan 12, 2021, 7:05 am |
|
ASHRAE 62.1 2013 for NC-2009 IEQp1- Minimum IAQ PerformanceNC-2009 IEQp1: Minimum indoor air quality performanceposted by Ganesh Dhanakotti on Feb 19, 2019, 1:26 am
Hi, Our project consists of office building and workshop which is going for LEED v3 2009. The workshop is 105 feet wide, which is not able to compliance for IEQ Prerequisite 1 ... Last reply: Mohamed Helmy, Dec 17, 2020, 10:37 am |
|
Simulating Electrical System as back up for Solar Hot Water SystemNC-2009 EAp2: Minimum Energy Performanceposted by Achelles DSouza on Nov 11, 2020, 4:22 am
I am simulating a hotel building. Domestic hot water requirement will be contributed by solar powered calorifier. Electric hot water system will be provided for back up. Is it fine if I neglect... Last reply: Achelles DSouza, Nov 11, 2020, 10:59 pm |
|
How to draw the 11 degree line to calculate unobstructed viewHealthcare-v2009 IEQc8.2: Daylight and views - viewsposted by P Hariharan on Apr 26, 2016, 1:29 amas possible.. Log in or register to post comments Maya Karkour EcoConsulting LEEDuser Basic Member 871 thumbs up May 3, 2016- 8:45 am Please provide me with email, as it is not possible on forum, Thanks Log... Last reply: , Aug 5, 2020, 3:42 pm |
|
Evaporative Cooling unitsNC-v4 EAp2: Minimum Energy Performanceposted by sonali rajwade on Jun 7, 2020, 10:41 am
We are working on a Manufacturing Building project in India. Direct evaporative cooling units (ECU) are used for cooling in certain spaces like office areas and a manufacturing area in the... Last reply: sonali rajwade, Jun 15, 2020, 8:17 am |
|
Minimum IAQ performance monitoring requirementNC-v4 EQp1: Minimum indoor air quality performanceposted by sonali rajwade on Feb 22, 2019, 1:52 am