LEED v4.1 Renewable Energy- no contracts with a period longer than two years available

NC-v4.1 EAc5: Renewable energy
posted by J Schütz on Apr 2, 2020, 10:30 am

Dear all,

Actually, German law prohibits electricity contracts with a fixed contract period longer than two years, there has to be the possibility to cancel the contract. Although, the...

Last reply: Hashir Usman, Mar 30, 2022, 7:44 am

EAc7- Since when it's neccessary the RECs/Carbon offsets

CS-v4 EAc7: Green power and carbon offsets
posted by Instra Ingenieros on Mar 22, 2022, 11:49 am

Hi everyone, hope anyone can help me with this issue.

I'm trying to meet this credit purchasing both RECs and Carbon Offsets for both electric and carbon consumptions. It is clear that we...

Last reply: Marcus Sheffer, Mar 28, 2022, 11:36 am

Flush out in warhouse zone

Warehouses-NC-v4.1 EQc4: Indoor air quality assessment
posted by Carine HUANG on Mar 9, 2022, 11:21 am

Hello, I am working on a warehouse project.

The storage in the warehouse will be ventilated with an exhaust fan to meet the calculated minimum fresh air flow requirement (0.4 L/s/m²). If...

Comparison between the three systems BREEAM, DNGB LEED

LEED Rating System Selection
posted by Wisam Maddni on Mar 9, 2022, 4:03 am

Dear ladies and gentlemen,

I would like to ask this question: Are there currently properties that have several certification systems (...

Existing Building with DES: choosing v4/v4.1, DES modelling strategy

CS-v4 EAc2: Optimize Energy Performance
posted by Sarah Leenknegt on Jan 31, 2022, 11:18 am

Hi everyone

We are trying to make some strategic decisions and would be happy about some feedback. First a short summary, two questions are below.

Situation is an existing office...

Last reply: Tyler Thumma, Mar 8, 2022, 8:44 am

Legal division of a building and option for certification

LEED Guidance for Campuses and Multiple Buildings
posted by Daniel Villar San Juan on Mar 2, 2022, 3:03 am

Dear all,

we have a change of ownership in our already pre-certified LEED v4 BD+C Core&Shell project.
The new owner will divide the building in three parts that are legally...

Thermal comfort using thermal dynamic simulation

NC-v4 EQc5: Thermal comfort
posted by Eduardo Vidal Kume on Mar 1, 2022, 8:47 am

Hi! Does anyone have experience with LEED Credit EQc5 Thermal Comfort using thermal simulation?

We know that all occupied rooms should comply to it but is not clear to us if we should...

Existing Building with DES: choosing v4/v4.1, DES modelling strategy

CS-v4.1 EAc2: Optimize Energy Performance
posted by Sarah Leenknegt on Feb 1, 2022, 5:17 am

(Appologies for double posting, I posted the same question on the v4-forum. Just realized it is probably more appropriate on the v4.1 page.)

Hi everyone

We are trying to make some...

Last reply: Tyler Thumma, Feb 17, 2022, 12:20 pm

Entryway systems and primary direction

EBOM-v4.1 EQc1: Green Cleaning
posted by Audrey LEDESERT on Oct 21, 2021, 5:13 am

Hello,

Under option 2 - Entryway systems, we need to put in place 10 feet elements in the primary direction of travel.
In our project, people enter and can travel in 2 different...

Last reply: Afogreen Build, Feb 9, 2022, 9:24 am

EA prerequisite and Option 2. Prescriptive compliance: ASHRAE 50% Advanced Energy Design Guide for Warehouses

Warehouses-NC-v4 EAp2: Minimum Energy Performance
posted by Carine HUANG on Jan 20, 2022, 10:59 am

Hello, 

I'm currently working on a warehouse house project. We are following the Option 2. Prescriptive compliance: ASHRAE 50% Advanced Energy Design Guide.

According to the Guide,...

Last reply: Marcus Sheffer, Feb 4, 2022, 10:39 am