Topic | Recent |
---|---|
Building Product Calculator and Low emitting materials CalculatorNC-v4.1 MRc3: Sourcing of Raw Materialsposted by Saif Ahmed Mohammed on Jul 30, 2024, 2:56 pm
Hello guys, I wanted to know where can I be able to get the knowledge to document the following calculators "Building Product Calculator and Low emitting materials Calculator". As I am... Last reply: Wakas Khookhar, Jan 2, 2025, 12:44 pm |
|
Help needed with ARC platformEBOM-v4 MPR1: Must be in a permanent location on existing landposted by Antonio de Sousa Filho on Dec 17, 2024, 1:35 pm
Hi everyone, I’m working on an existing building re-certification in Calgary AB, and have already uploaded some documents to the ARC platform. According to the instructions, the score... Last reply: Jeff Benavides, Dec 19, 2024, 2:58 pm |
|
STC requirement for a Retail area next to a hallway in a medical buildingNC-v4 EQc9: Acoustic performanceposted by Todd Bundren on Dec 18, 2024, 4:04 pm
We are working on a new medical buidling (cancer center) and there is a gift shop off a large corridor close to the main entry. The owner wants the wall between the gift shop and the large... |
|
TBLA Calculation of Cx SavingsPilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysisposted by Candice Rogers on Apr 23, 2024, 10:15 pm
Hello - one of the newer features of Autocase is the calculation of... Last reply: Mansoureh Jalali, Dec 18, 2024, 10:23 am |
|
Achievement of Triple Bottom Line Analysis by Major Credit CategoryPilot-Credits INpc122: Informing Design by Major Credit Category Using Triple Bottom Line Analysisposted by Candice Rogers on May 20, 2020, 5:01 pm
Hello. We have documented Triple Bottom Line Analysis using Autocase for a Warehouse and Distribution Center. The effort returned very interesting results in terms of values and particularly... Last reply: Mansoureh Jalali, Dec 18, 2024, 10:00 am |
|
Reuse/ Salvage Materials for Option 2- Path 4NC-v4.1 MRc1: Building life-cycle impact reductionposted by Eslam Elshorbagy on Jul 30, 2024, 2:58 pm
Hi everyone, I would like to clarify the difference between... Last reply: GianCarlo Greco, Dec 17, 2024, 10:22 am |
|
Energy Performance on Air Structured DomeNC-v4.1 EAp2: Minimum Energy Performanceposted by Thomas Jangaard on Dec 11, 2024, 2:07 pm
Hello, The majority of our project footprint is a permanent air supported dome sports facility and have not been able to find precedent of such projects earning certification. We... |
|
LEED v4 BD+C, EAc1 Enhanced Cx, Option 2. Envelope Cx: Can General Contractor contract for the BECx testing?NC-v4 EAc1: Enhanced Commissioningposted by Theresa Lehman on Dec 10, 2024, 9:46 am
Has anyone come across a scenario where the general contractor is required to contract for the functional testing of the building envelope... Last reply: Dave Hubka, Dec 10, 2024, 10:57 am |
|
Stakeholder EngagementPilot-Credits INpc122: Informing Design by Major Credit Category Using Triple Bottom Line Analysisposted by Mansoureh Jalali on Dec 6, 2024, 4:28 pm
What strategies or best practices can help project teams engage stakeholders in the Triple Bottom Line analysis to ensure diverse perspectives and comprehensive results? Last reply: Mansoureh Jalali, Dec 6, 2024, 4:29 pm |
|
Quality Views Analysis Results is AutoCasePilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysisposted by Mansoureh Jalali on Dec 5, 2024, 5:53 pm
When I try to add my Views study results to AutoCase it asks for the type of view for both baseline and proposed design. I usually use ClimateStudio for the Views study and not sure how to... |