Topic | Recent |
---|---|
Projects with no associated off-street parkingCS-v4 LTc7: Reduced parking footprintposted by Esteban Martinez on May 31, 2017, 4:48 pm
The team has the following doubt: at the LEED guide says that the project allowable parking must be less or equal to minimum code, but then says that if the project is not associated to off-... Last reply: Summer Minchew, Feb 14, 2020, 8:46 am |
|
Graded Site- Previously Developed SiteWarehouses-NC-v4 LTc4: Surrounding density and diverse usesposted by Pedro Julio Silva Perez on Feb 13, 2018, 3:26 pm
For a Distributuion Center project located in an industrial park , the developer enhanced the mechanical soil properties through grading the whole site area. This happened approximately two... Last reply: Kara Strong, Nov 19, 2018, 9:03 am |
|
District or campus thermal energy guidance for HealthcareHealthcare-v2009 EAp2: Minimum Energy Performanceposted by Lina Maria Garcia Niño on Oct 26, 2018, 3:41 pm
Dear all, a) I´m currently working in a Healtcare project LEED V3 2009 .I have been searching the requirements for this kind of building regarding to the Treatment of District or Campus... |
|
100% Outdoor air clarificationCS-v4 EQp1: Minimum indoor air quality performanceposted by Diego Prada on Sep 20, 2018, 6:11 pm
Hi, We are working on a Core and Shell Office project where there is a central air circulation system with natural ventilation, which has permanent openings in the facades, 24 hours a day... |
|
Strategy to fulfill the pilot credit Quality views in non regularly occupied spacesNC-v4 EQc8: Quality Viewsposted by Angela Atehortua on Aug 7, 2018, 10:31 pm
In a Project that we are advising that consists of an Innovation building for a University, we are aiming to achieve this pilot loan by implementing two main strategies, the first is that all... Last reply: TODD REED, Aug 8, 2018, 10:38 am |
|
Natural Ventilation Procedure- Prescriptive Path 62.1 2010NC-v4 EQp1: Minimum indoor air quality performanceposted by Nicolas Martinez Ochoa on May 24, 2018, 5:30 pm
Hello everyone, I have a question about the location and sizing openings, in the building we have spaces with double side openings, in opposite facades. The 6.4.2 section specifies that... Last reply: Dionisio Franca, May 28, 2018, 4:31 am |
|
Direct vs indirect measurementsNC-2009 EAc5: Measurement and Verificationposted by Cesar Ruiz on Dec 9, 2014, 3:54 pm
Hi everyone, We are working on a Residential New Construction Project, compound of more than 100 apartments, pursuing Option D - Calibrated Simulation. All apartments will have their own... Last reply: Marcus Sheffer, Feb 9, 2018, 1:37 pm |
|
Project located in "Urban Expansion Zone" per zoning ordinanceNC-2009 SSc2: Development Density and Community Connectivityposted by Diego Prada on Nov 29, 2017, 2:59 pm
Greetings, We are working on a project for which with our team we have had "theoretical discussions" about being eligible for this credit, and which path to use in others. Hopefully you... Last reply: Diego Prada, Dec 19, 2017, 12:23 pm |
|
About Existing Building for RetailEBOM-v4 EQp1: Minimum indoor air quality performanceposted by Esteban Martinez on Apr 5, 2017, 1:13 pm
Hello, we are working on a existing building retail project, which has 43720.42ft2 and 31.16ft height with CO2... Last reply: Ben Stanley, Aug 31, 2017, 7:44 pm |
|
multi occupant spaces for outpatientHealthcare-v2009 IEQc6.1: Controllability of systems - lightingposted by andres ramirez on May 12, 2016, 12:25 pm
HI, Last reply: Susan Walter, Aug 29, 2017, 4:56 pm |