Topic | Recent |
---|---|
Group or single project for WarehouseNC-v4 MPR2: Must use reasonable LEED boundariesposted by Sofia Barahona on Mar 11, 2020, 4:15 pm
We are currently working on a warehouse which has a total of 12,704.13m2, the project consist of a building of storage and operative offices with a total of 12,516.67m2 and a small separate... Last reply: Summer Minchew, Mar 15, 2020, 8:53 am |
|
Automatic Receptacles LEED InterpretationNC-v4.1 EAp2: Minimum Energy Performanceposted by Sofia Barahona on Jan 17, 2020, 8:10 am
We are attempting to work on a project in LEEDv4.1, which in Optimize Energy Performance states that ASHRAE 90.1-2016 mandatory provisions must be met. However we are wondering if the following... Last reply: Sofia Barahona, Mar 6, 2020, 10:59 am |
|
Distribution of preferred parking on mixed-used buildingsNC-v4 LTc8: Green vehiclesposted by Sofia Barahona on Dec 20, 2019, 1:58 pm
Hi, we are working on a Core and Shell project which has mixed uses: offices and commercial. The project has 4 levels of underground parking, there are two levels assigned exclusively for the use... Last reply: Dionisio Franca, Dec 22, 2019, 8:02 pm |
|
Mandatory Provision for Lighting Controls C&SCS-v4 EAp2: Minimum Energy Performanceposted by Sofia Barahona on Oct 14, 2019, 10:00 am
We are currently working on a LEED Core and Shell v4 office building on Santiago, Chile. Regarding the issue of mandatory provisions ASHRAE 90.1-2010, if there is a binding lease or sale... Last reply: Tyler Thumma, Dec 20, 2019, 11:06 am |
|
Setback requirementNC-v4 EAp2: Minimum Energy Performanceposted by Sofia Barahona on Nov 6, 2019, 2:56 pm
Hi, We are working on an office building where some private offices are served by split system. How does the setback requirement is met on these specific HVAC system? Last reply: Sofia Barahona, Nov 7, 2019, 3:39 pm |
|
Ventilation in CorridorsNC-v4 EQp1: Minimum indoor air quality performanceposted by Sofia Barahona on Oct 29, 2019, 12:24 pm
We have a question regarding the ventilation requirements on corridors in order to comply with requirements of Minimum Indoor Air Quality Performance prerrequisite. Do we need to provide... Last reply: Sofia Barahona, Nov 4, 2019, 7:44 am |
|
Manufacturing Plant Energy ConsumptionNC-v4 EAp2: Minimum Energy Performanceposted by Sofia Barahona on Oct 30, 2019, 3:13 pm
We are working on a project that is pursuing LEED v4: New Construction. This project is a plasterboard manufacturing plant, in which an important part of its energy consumption is produced by... Last reply: Marcus Sheffer, Oct 30, 2019, 5:50 pm |
|
Definition of Material StreamsNC-v4 MRp2: Construction and demolition waste management planningposted by Christopher Russell-King on Oct 2, 2018, 1:34 pmhttps://leeduser.buildinggreen.com/forum/regulation-commingled-recycling-facilities and h ttps://leeduser.buildinggreen.com/forum/filling-out-cd-waste-calculator). Can you clarify that you are getting project-specific rates or average diversion rates for the facility? Log... Last reply: Tiffany Beffel, Oct 17, 2018, 3:07 pm |
|
Does restrooms exhaust can comply with the prerequisite requirements in a residential building?NC-v4 EQp1: Minimum indoor air quality performanceposted by Felipe Duran on Sep 11, 2018, 11:00 am
Dear All, We are working on a naturally ventilated residential project with 295 dwelling units. The project comply with the monitoring requirements. Can we comply with the... |
|
Enhanced Indoor Air Flows in Spaces under ASHRAE 170 clasificationHealthcare-v4 EQc1: Enhanced indoor air quality strategiesposted by Jose Antonio Kovacevic on Apr 11, 2018, 3:21 pm
Hello, I am assessing the indoor airflow needs of an hospital pursuing credit EQc1, option 2. I was wondering if the exigence of EQc1 option 2 to increase flow rate by 30% in all occupied... |