Clarification on HVAC System Efficiency Requirements for LEED ComplianceData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Anurag Ghosh on Apr 15, 2025, 4:58 am
Hello everyone, From my understanding, the proposed HVAC system must be more efficient than the baseline system modeled according to Appendix G of ASHRAE 90.1. Additionally, the proposed... Last reply: Marcus Sheffer, Apr 15, 2025, 10:12 am |
|
Data Center LPDData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by David Edenburn on May 27, 2019, 3:44 am
When we use the S-by-S method we have problems with some rooms being over-lighted. On average, we are pretty good. ASHRAE 90.1 table 9.5.1 gives various building types for doing the whole-... Last reply: Marcus Sheffer, Apr 15, 2025, 10:07 am |
|
core and shell data centerData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Amgad Khattab on Jul 16, 2023, 4:23 am
Hi everyone, I'm working on a LEED project for a core and shell data center. The client has not yet purchased the servers, so we don't have any information about their efficiency. I'm... Last reply: Amgad Khattab, Jul 17, 2023, 1:46 pm |
|
Colocation Data CenterData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by David Edenburn on Nov 12, 2019, 7:59 pm
In the minimum energy performance calculator, the first tabs are about the servers. I have a "colo" data center, the empty data halls are rented out to clients, essentially tenants. We only... Last reply: Marcus Sheffer, Jul 16, 2023, 4:27 pm |
|
Regarding Energy SimulationData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Nagaraj Sankar on Feb 8, 2023, 6:25 am
One of our data center projects has an electrical room. This electrical room didn't have regular occupants. In this case, do we need to provide fresh air for that space? In Ashrae 62.1 (... Last reply: Tyler Thumma, Feb 13, 2023, 7:48 am |
|
Regarding Energy SimulationData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Nagaraj Sankar on Feb 8, 2023, 6:29 am
One of our data center projects has an electrical room. This electrical room didn't have regular occupants. In this case, do we need to provide fresh air for that space? In Ashrae 62.1 (... |
|
DATA CENTERS- Baseline modelingData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by HoMU WELLTECH on Jun 2, 2021, 12:51 pm
Hi Marcus, We are involved on a Data Center LEED project and USGBC requires whole building energy modelling. Gross cooling capacity SUM (kW) 33.992 with a... Last reply: Tyler Thumma, Jun 3, 2021, 11:47 am |
|
EN 50600 standard for Data CentersData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Diego Casado on Sep 23, 2020, 10:01 am
We are trying to figure if there are alternative compliance paths using Data Center specific standards. Has anyone considered/used the European Standard EN 50600 to document energy... |
|
Waste heat recoveryData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Paula Rantanen on Oct 5, 2015, 4:04 am
I have a question concerning waste heat recovery in data centers. Recovery of the waste heat (directly or assisted with heat pumps) is part of many guidelines and best practices concerning data... Last reply: Pooja Sannamani, Jul 3, 2020, 3:42 pm |
|
Reg: Energy Modelling Requirement Scenarios for DC under V4Data-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Rajesh Balachander on Jun 29, 2020, 12:05 am
Hi All Can anyone clarify me this if my understanding is right? (Reference: https://www.usgbc.org/credits/reqea1r18-0?view... |