Baseline HVAC, Non-regulated loads and Exceptional Calculation Method for V4.1NC-v4.1 EAp2: Minimum Energy Performanceposted by on Dec 6, 2023, 9:54 pm
A 156,000 SF pharmaceutical production facility wants to pursue LEED v4.1. Building breakdown as follows:
|
|
beyond the 25 feet boundary and neighboring businessCI-v4 EQp2: Environmental tobacco smoke controlposted by Edgar Arevalo on Dec 6, 2023, 4:10 pm
There is a library project I'm working on which has a policy of no smoking within 100 feet from the entrance. The thing is it is next to neighboring business that are are within the 100 feet and... |
|
Integrative Analysis of Building MaterialsPilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Chris Lombardo on Dec 3, 2021, 6:23 pmof LEED/Environmental Services Choate Construction Company LEEDuser Premium Member October 4, 2023- 5:07 pm EPDs/HPDs,SDS/MSDS all help address the requirements of this pilot credit. This forum has been so helpful... Last reply: Caleb Deck, Dec 4, 2023, 5:18 pm |
|
Documentation for Inherently non-emitting materialsNC-v4 EQc2: Low-emitting materialsposted by Edgar Arevalo on Sep 29, 2023, 11:46 am
We have an insulation material that can comply either as inherently non-emitting or meets general emissions evaluation, and has been checked as inherently non-emitting by the contractor, but no... Last reply: Dave Hubka, Dec 4, 2023, 5:05 pm |
|
Healthcare-v4.1 MRc6: PBT Source Reduction- Lead, Cadmium, and CopperHealthcare-v4.1 INc1: Innovationposted by Ann Busker on Feb 10, 2022, 12:38 pm
Good morning, I am looking for examples to send my Plumbing and Electrcial Subcontractors to explain thier process for copper pipe joints and recycling the electrical wires containing... Last reply: Ann Busker, Dec 4, 2023, 9:50 am |
|
LEED 4.1 Tier 2 & 3 Renewable Energy and District or Campus Thermal Energy (DES)NC-v4.1 EAc5: Renewable energyposted by Hans Marsman on Dec 2, 2023, 1:04 pm
We are working on a building connected to a campus central plant (... |
|
MRpc87 Verified Construction and Demo Recycling RatesNC-v4 INc1: Innovationposted by Marie Bizzak on Jul 29, 2020, 6:05 pmTrista Brown Project Director WSP USA LEEDuser Expert 449 thumbs up July 30, 2020- 12:45 pm Hi Marie- for (b) you should post on the MRpc87 LEEDuser forum (observations about the process or requirements, ideas for improvement, questions, etc) and take a screenshot of the post to include in your application. For (c) you should get a survey completion email that you can include in your application. Log in or register to post comments JLL Sustainability Consulting Senior Project Manager JLL LEEDuser Premium Member 3 thumbs up August 4, 2020- 5:12 pm You can find the credit-specific pilot credit... Last reply: Hapay Johan, Nov 28, 2023, 11:50 pm |
|
LEED-focused part-time jobHelp Wanted: LEED-related Jobsposted by Dan Piselli on Nov 17, 2023, 4:45 pm
FXCollaborative is looking for part-time help completing in-house LEED documentation on a few projects. This is a great opportunity for young professionals who are very knowledgeable about LEED... Last reply: Dan Piselli, Nov 27, 2023, 10:31 am |
|
Exemption for workshop spaces?NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Adrienne Franz on May 23, 2023, 4:42 pm
We are doing a building where half the building is offices and the other half is workshops for parks maintenence staff. (I'm talking mechanical, carpentry, tree crew). These rooms have 2 Hollow... Last reply: Emmet English, Nov 23, 2023, 11:08 am |
|
Distance to entrance within a large campusNC-v4.1 LTc6: Bicycle facilitiesposted by on Nov 16, 2023, 3:35 pm
Working in predesign on a new construction building within a large site, wherein the site has only one public entrance. That entrance is an existing welcome center, and bicycles are not permitted... |