Access to Quality Transit: Functional entry of the project in a MallRetail-CI-v4 LTc3: Access to quality transitposted by herminia gammarano on Mar 7, 2022, 5:02 am
Hello LEED community, My question is regarding to the requirement of the credit Access to Quality transit, It said to locate any fuctional entry of the project within 1/4... |
|
BES 6001- USGBC approved leadership extraction practice?NC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Juliana Moreira on Jan 7, 2015, 11:42 am
The credit intent is to reward project teams for selecting products verified to have been extracted or sourced in a responsible manner. In the UK we have standard BES 6001 to enable... Last reply: Kat Mazur, Oct 1, 2021, 5:40 am |
|
Third Party Certification TableCI-v4.1 EQc2: Low emitting materialsposted by Zoe French on Jul 13, 2021, 4:35 am
There is a document for LEED V4 which shows alternative certificate types/testing methods for compliance with this credit. ... |
|
(mis)Understanding the LEED Review (and appeal) processLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Susannah Goddard on Apr 28, 2015, 10:04 am
We have recently undergone the Final Design Stage Review and have some credits 'denied'. I was of the understanding that we could submit additional documentation to denied design stage credits... Last reply: Marcus Sheffer, Jul 9, 2021, 11:54 am |
|
Light Trespass- Consideration for presence detectionNC-v4 SSc6: Light Pollution Reductionposted by James Cox on Jul 6, 2021, 7:18 am
Hi All, We are currently struggling to achieve the... Last reply: David Hubka, Jul 6, 2021, 5:24 pm |
|
Energy Star Ratings for AppliancesLEED v4.1 Discussion Forumposted by Jeremy Smith on Feb 26, 2021, 11:27 am
Can anyone advise what is the Energy Star rating criteria for a Network Switch Power Supply, or does this device fall outside of the Energy Star Rating requirements and can therefore be excluded... |
|
UK and EU standards compliant with LEEDEBOM-v4 EQp3: Green Cleaning Policyposted by Lara Coutinho on Feb 4, 2021, 5:15 am
Hi, I'm working on the green cleaning policy, what is compatible with the below in the UK?
|
|
ENERGY STAR equipment WattageCI-v4 EAc2: Optimize Energy Performanceposted by Michael d on Nov 13, 2020, 5:26 am
When inputting ENERGY STAR equipment wattage, do we include the idle, average or maximum wattage used by the equipment? Last reply: Marcus Sheffer, Nov 27, 2020, 1:01 pm |
|
Space-by-Space Method / Exceptions to Interior Ligtiing Power AllowanceCI-v4 EAp2: Minimum Energy Performanceposted by James Pack on Nov 6, 2020, 10:06 am
Hi I am preparing a LEED project for a jewellery boutique in London. They are purchasing free standing display cabinents with intergral lighting - the cabinets are to be assembled /... Last reply: Marcus Sheffer, Nov 20, 2020, 12:14 pm |
|
[Pilot] Enhanced Acoustical Performance- Exterior Noise ControlCI-v4 INc1: Innovationposted by James Mahinay on Oct 25, 2018, 5:04 am
Hello All, We are targeting this pilot credit and one of the submittals required is an “operations plan for testing of emergency equipment, describing the reason a particular time of day... Last reply: Dionisio Franca, Oct 22, 2020, 2:56 am |