Unregulated Electricity UsePilot-Credits EApc161: Electrification ACP: Energy Simulation Performance Pathposted by Zeynep Cakir on Mar 15, 2023, 9:32 am
Dear all, We are attempting this pilot credit but we are a little bit confused about the unregulated electricity input. It's asked to input the unregulated electricity in the LEED... |
|
locker romsPilot-Credits WEpc147: All-Gender Restroomsposted by Belén Palao on Apr 27, 2022, 12:45 pmPaula Melton Editorial Director BuildingGreen, Inc. LEEDuser Moderator 172 thumbs up April 28, 2022- 11:21 am Hi, Miguel! I'm hoping someone on here might have an answer for you. However, just keep in mind that posting to LEEDuser is not the same as writing to LEED Coach. This is an independent grassroots forum. The email for LEED Coach is leedcoach@usgbc.org. Log in or register to post comments Zeynep Cakir LEED AP BD+C, WELL AP, Sustainable Building Consultant ECOBUILD LEEDuser Basic Member 9 thumbs up March 13, 2023- 9:12 am Dear Miguel, Have you received any feedback from the LEED... Last reply: Zeynep Cakir, Mar 13, 2023, 9:12 am |
|
Overall credit experiencePilot-Credits EQpc116: Daylight in nonregularly occupied spacesposted by Valeria Fiorentino on Mar 18, 2022, 8:02 am
As the project was already pursuing Daylight credit we have been able to use the same simulation tool for this piot credit. The project has a great façade from a daylight perspective, which... Last reply: Collin Robinson, Feb 20, 2023, 3:58 pm |
|
Project BoundaryHealthcare-v4.1 LTc2: Sensitive land protectionposted by Jordi Castellano on Feb 13, 2023, 10:29 am
Good afternoon, According to the LEED v4.1 handbook, if we locate the project on land where it was already developed, but our project goes a little over the boundaries, do we have to get... Last reply: Dave Hubka, Feb 15, 2023, 1:23 pm |
|
Major RenovationCS-v4 EAp2: Minimum Energy Performanceposted by Helena Garcia on Jan 30, 2023, 9:55 am
Dear LEED users, We are working in a renovation project which design a new envelope. This new design defines different project floor areas. According to AppendixG-TableG3.1.5... Last reply: Marcus Sheffer, Jan 30, 2023, 6:56 pm |
|
Electric vehicles supply equipmentsCS-v4.1 LTc8: Electric Vehiclesposted by Helena Garcia on Nov 7, 2022, 7:44 am
Would it be possible to count electric motorcycles as electric vehicles as well? Or, as electric vehicles, only cars and vans are valid? |
|
Entryway system and fire securityWarehouses-NC-v4 EQc1: Enhanced indoor air quality strategiesposted by Helena Garcia on Jan 16, 2017, 11:30 am
The project is a warehouse divided in two parts: storage and offices. For to achieve this credit it applies entryway system which have to be a special carpet of 3 meters long, continuous and... Last reply: Soha ElYamany, Oct 17, 2022, 10:02 am |
|
Credits substitution to v4.1LEED v4.1 Discussion Forumposted by Instra Ingenieros on Sep 21, 2022, 2:57 am
We are trying to upload the evidences of a project to LEED online (v4, BD+C Core and Shell), but we are having trouble with those credits that pursue version 4.1. Despite credit substitution is... |
|
Data Center load for Renewable Energy designData-Centers-NC-v4 EAc2: Optimize Energy Performanceposted by Instra Ingenieros on Jun 20, 2022, 12:20 pm
We have a question about the energy simulation of a Data Center. We have completed the v4 Minimum Energy Performance Calculator introducing full IT and initial IT loads. After completing the... Last reply: Tyler Thumma, Jun 29, 2022, 8:32 pm |
|
LTc5- Heat Island Reduction- examplary performanceNC-v4 SSc5: Heat Island Reductionposted by Maria Peralta on Jul 4, 2019, 5:17 am
Hello, I have a doubt about the examplary performance of this credit. In the project with I am working doesnt has a parking and I achieved the option 1, so at is says in the LEED guide:... Last reply: emily reese moody, Apr 30, 2022, 12:43 pm |