Log in
Forum » Israel
Topic

HERS index- does a special rater required?

Homes-v4 EAc1: Annual energy use
posted by Chen Shalita on May 27, 2017, 8:04 am

Hello everyone,
I'm exploring the possibility of certification of a lovely house to LEED for Homes.
My question is:
1. is it compulsory to have the house audited by this RESNET...

Last reply: Mohammed Fadili, Jun 1, 2023, 12:59 pm

Interiors Life-Cycle Impact Reduction- Option 3 Design for Flexibility

CI-v4.1 MRc2: Interiors life-cycle impact reduction
posted by Laura Riegle on Jul 13, 2022, 9:26 am

Hi, 

I am persuing the "Interiors Life-Cycle Impact Reduction" credit,  Option 3: Design for Flexibility for a CI project.

In the project, there are concrete floors (no systems to...

Playground lighting

CS-v4 SSc6: Light Pollution Reduction
posted by Chen Shalita on May 4, 2021, 3:26 am

Hello, in one of our projects, there is a playground lit by lighting fixtures around it. Can these lighting fixtures be considered as landscape fixtures, so they could be excluded from the...

Last reply: Bill Swanson, May 4, 2021, 9:43 am

four buildings with a public square

ND-Plan-v4 NPDp1: Walkable Streets
posted by Sareet Benayahu on Oct 10, 2018, 7:11 am

Hi,

Our LEED ND-Plan Project has a few Large Lots, on which there are three or four buildings planned at the edges of the lots and in the center a large public square. There are wide...

Last reply: David Posada, Nov 25, 2019, 8:22 pm

Which Prescriptive Compliance guidelines for large office buildings?

ND-Plan-v4 GIBp2: Minimum building energy performance
posted by Sareet Benayahu on Oct 17, 2018, 4:07 am

Hi,

I am preparing the energy planning guidelines for a LEED ND Plan Business sector. I am looking for prescriptive compliance guidelines for office buildings 30 or more stories tall (more...

Last reply: Eliot Allen, Oct 17, 2018, 12:24 pm

MLO Non-Residential Lighting using the Performance Method

NC-v4 SSc6: Light Pollution Reduction
posted by Candace Cohen on Jun 17, 2018, 7:40 am

The MLO says that in order to establish the Total Initial Site Lumens one must use Table D, adding together the Allowed Lumens Per Square Foot and the Allowed Base Lumens Per Site. Could someone...

Last reply: Candace Cohen, Jun 26, 2018, 5:23 am

Timeline issues with "Recycle or Reuse Construction and Demolition Waste"

ND-Plan-v4 GIBc16: Solid waste management
posted by Ilan Yahav on Jun 25, 2018, 10:06 am

How can we proceed with this credit in a LEED ND-plan, if there is a requirement to track diverted waste?

The infrastructure works in this project will only begin after the plan phase is...

Last reply: Eliot Allen, Jun 25, 2018, 11:59 am

Previously developed and graded area by municipality- How long before construction?

NC-2009 SSc1: Site Selection
posted by Ilan Yahav on Jun 11, 2018, 5:58 am

I am working on a Non-US project that is located in a new neighborhood that had been graded and developed by the local Municipality (roads and sidewalks) in 2006. Is there a time limit for sited...

Post occupancy assesment

NC-v4 EQc4: Indoor air quality assessment
posted by eran ben kennaz on Feb 25, 2018, 9:26 am

I was asked by the client to collect air samples now- a month after occupancy (he says he forgot to call me before.......). Would that be acceptable when they send in the reports?

...

Last reply: Alice Delia, Mar 8, 2018, 9:29 am

Greenfield or previously developed?

NC-2009 SSc5.1: Site development - protect or restore habitat
posted by Ilan Yahav on Jun 19, 2017, 7:13 am

I'm wondering if a project I'm working on, situated near the coast in Israel, is considers a...

Last reply: Summer Minchew, Aug 29, 2017, 10:20 am