Topic | Recent |
---|---|
Minimum Airquality Performance Mechanical Ventilation of Staircase and Elevator LandingNC-v4 EQp1: Minimum indoor air quality performanceposted by Francesco Emanuele Contaldo on May 7, 2025, 10:28 am
Hi everyone and thanks in advance for your attention and support. |
|
Water metering of DHW in relation to Janitor's sinkNC-v4 WEc4: Water meteringposted by R Jones on Mar 19, 2025, 5:15 am
Hi LEED Users/Experts/Fellows, I have a small office building under LEED-NC-v4.0 and I am dealing with water metering of end-uses. We selected domestic-hot-water (... Last reply: R Jones, Mar 20, 2025, 8:23 am |
|
ASHRAE 90.1 requirementsNC-v4 EAp2: Minimum Energy Performanceposted by Guillaume Rose on Oct 1, 2019, 5:28 am
Hi, I work on a Core & Shell project based in Paris and i have a question about ASHRAE 90.1 Standards, and more especially on the possibility to derogate to certain requirements. On... Last reply: Marcus Sheffer, Mar 11, 2025, 9:57 am |
|
Guidance on Green Wall Irrigation RequirementsData-Centers-NC-v4 WEc1: Outdoor water use reductionposted by Venkatkrishnan Ashok on Dec 10, 2024, 11:58 am
Hello, We are proposing a green wall for our project, which will require irrigation and must adhere to the guidelines outlined in Option 2 of this credit. However, we were unable to locate... Last reply: Quantity Takeoff, Jan 7, 2025, 12:43 am |
|
Additional minimum requirementData-Centers-NC-v4.1 EAp2: Minimum Energy Performanceposted by Luis Andrade on Dec 9, 2024, 9:40 am
Hi everyone, We're performing a LEED V4.1 Datacentre certification. LEED V4 stated that in addition to all "regular" minimum requirements, the project should also achieve "(...) a minimum... Last reply: Marcus Sheffer, Dec 13, 2024, 8:41 am |
|
LCA for only furniture, is it possible?CI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Eslam Ahmed on Oct 9, 2024, 3:53 pm
We are currently working on a LEED ID+C certification project. It involves a rental space where our customer is just the tenant, who will take over the space fully finished. He is only... Last reply: Eslam Ahmed, Oct 25, 2024, 5:42 am |
|
Detaining the rainwater runoff-an accepted solution?NC-v4 SSc4: Rainwater managementposted by Florian Schmidtchen on Dec 8, 2016, 6:13 am
Dear all, Last reply: Andrey Kuznetsov, Oct 23, 2024, 1:59 am |
|
Baseline parking for a DATACENTERNC-v4 LTc7: Reduced parking footprintposted by Marion THIBAULT on Jun 23, 2020, 12:10 pm
Hi everyone, I'm working on a DATACENTER project, and I can't find the baseline parking capacity for this type of building. It is not included in the "TABLE 1 - Base Ratios for parking... Last reply: Gioia Connell, Oct 16, 2024, 12:34 pm |
|
ventilation of corridors and elevator ante roomsEBOM-v4 EQp1: Minimum indoor air quality performanceposted by Arwid Theuer-Kock on Oct 27, 2022, 4:54 am
Hi all, we have an existing building in Germany where the corridors and elevator ante rooms are not ventilated mechanically. In addition there are also no windows for natural ventilation... Last reply: Daniele De Angelis, Oct 1, 2024, 7:21 am |
|
SRI for a GREENHOUSECS-v4 SSc5: Heat Island Reductionposted by Marion THIBAULT on May 15, 2020, 10:00 am
Hello everyone, I'm working on a project that plans to integrate a greenhouse. I wonder how to consider the roof of the greenhouse for the... Last reply: Andrey Kuznetsov, Sep 9, 2024, 9:59 pm |