Baseline Calculation & AHU CondensatePilot-Credits WEpc115: Whole Project Water Use Reductionposted by Kim C on Jul 21, 2024, 10:50 am
The project is an industrial facility with it's own wastewater treatment system. 1) Do we claim all the reused process water under Row82 Non-... Last reply: Gerardo Trejo, Apr 29, 2025, 5:49 pm |
|
PRIVATE SHUTTLE FOR A FACTORY LOCATED IN A UPCOMING INDUSTRIAL DEVELOPMENT WITH NON-EXISTANT PUBLIC TRANSPORTATIONNC-v4.1 LTc5: Access to quality transitposted by Amal Venugopal on Jul 27, 2022, 5:13 am
The BD+C, NC project we are applying for is a factory with manufacturing unit and office spaces, located in an developing industrial area with no mutimodel transportation facilities . The... Last reply: Sudipta Ghosh, Mar 21, 2025, 1:51 am |
|
G3.1.1 exception d exhaust hood airflow baselineNC-v4 EAp2: Minimum Energy Performanceposted by Junaid Mujahid on Mar 3, 2025, 12:29 am
Hi All, G3.1.1 exception d states that if a kitchen has an exhaust hood airflow rate of greater than 2400 l/s, a secondary HVAC system should be used for that space. What would be the... Last reply: Marcus Sheffer, Mar 4, 2025, 9:34 am |
|
Air-Cooled Chiller Efficiency Compliance with ASHRAE 90.1-2016 and LEED v4.1NC-v4.1 EAp2: Minimum Energy Performanceposted by Amgad Khattab on Feb 3, 2025, 2:05 am
We are working on a project pursuing LEED v4.1 certification using the Appendix G Performance Path. The air-cooled chiller in our design complies with the IPLV (Integrated Part Load Value)... Last reply: Tyler Thumma, Feb 24, 2025, 7:55 am |
|
Baseline Outdoor Air Requirement for Kitchen Exhaust & SupplyNC-v4 EAp2: Minimum Energy Performanceposted by Junaid Mujahid on Feb 13, 2025, 3:51 am
Hi Everyone, A project I'm modelling has a MAHU supplying 1800 l/s of Outdoor Air to the kitchen area to compensate for the 2000 l/s exhaust from the kitchen ecology unit. I have two... Last reply: Tyler Thumma, Feb 21, 2025, 11:27 am |
|
Service Water Heating with Solar CollectorsNC-v4 EAp2: Minimum Energy Performanceposted by Junaid Mujahid on Jan 29, 2025, 6:55 am
Hi Everyone, A project I'm working on has Solar Collectors as a primary source of service water heating with electric heaters for backup. I had modeled the service water heating electric... Last reply: Junaid Mujahid, Feb 21, 2025, 12:01 am |
|
Skylight > 5% of roof areaNC-v4 EAp2: Minimum Energy Performanceposted by Junaid Mujahid on Nov 27, 2024, 8:40 am
If the skylight area is greater than 5% of the... Last reply: Marcus Sheffer, Feb 13, 2025, 12:34 pm |
|
Does it have to be EXISTING infrastructure?ND-Plan-v4 SLLp1: Smart locationposted by Jeanne Davidson on Dec 19, 2024, 6:45 am
For this pre-requisite, we are developing a materplan where the buildings will be compliant with Option 4 once they are built. But they are not there yet and we are in the middle of a desert. Can... |
|
LEED boundary for a railway stationNC-2009 PIf1: Minimum Program Requirementsposted by Juan Sergio Simborio on Feb 28, 2015, 9:12 am
LEED NC 2009 Our project is a major railway station in Qatar. The shape of the... Last reply: Anurag Ghosh, Dec 18, 2024, 11:28 pm |
|
Partially designed HVAC systemCS-v4 EAp2: Minimum Energy Performanceposted by Junaid Mujahid on Dec 6, 2024, 3:33 am
I'm creating a PRM energy model for a Mall project which is a Core & Shell project in LEED v4. The project has some spaces with partially designed HVAC systems. For example, a Fresh... Last reply: Marcus Sheffer, Dec 6, 2024, 9:51 am |