Log in
Forum » Middle East
Topic

Baseline Calculation & AHU Condensate

Pilot-Credits WEpc115: Whole Project Water Use Reduction
posted by Kim C on Jul 21, 2024, 10:50 am

The project is an industrial facility with it's own wastewater treatment system. 

1) Do we claim all the reused process water under Row82 Non-...

Last reply: Gerardo Trejo, Apr 29, 2025, 5:49 pm

PRIVATE SHUTTLE FOR A FACTORY LOCATED IN A UPCOMING INDUSTRIAL DEVELOPMENT WITH NON-EXISTANT PUBLIC TRANSPORTATION

NC-v4.1 LTc5: Access to quality transit
posted by Amal Venugopal on Jul 27, 2022, 5:13 am

The BD+C, NC project we are applying for is a factory with manufacturing unit and office spaces, located in an developing industrial  area with no mutimodel transportation facilities . The...

Last reply: Sudipta Ghosh, Mar 21, 2025, 1:51 am

G3.1.1 exception d exhaust hood airflow baseline

NC-v4 EAp2: Minimum Energy Performance
posted by Junaid Mujahid on Mar 3, 2025, 12:29 am

Hi All,

G3.1.1 exception d states that if a kitchen has an exhaust hood airflow rate of greater than 2400 l/s, a secondary HVAC system should be used for that space. What would be the...

Last reply: Marcus Sheffer, Mar 4, 2025, 9:34 am

Air-Cooled Chiller Efficiency Compliance with ASHRAE 90.1-2016 and LEED v4.1

NC-v4.1 EAp2: Minimum Energy Performance
posted by Amgad Khattab on Feb 3, 2025, 2:05 am

We are working on a project pursuing LEED v4.1 certification using the Appendix G Performance Path. The air-cooled chiller in our design complies with the IPLV (Integrated Part Load Value)...

Last reply: Tyler Thumma, Feb 24, 2025, 7:55 am

Baseline Outdoor Air Requirement for Kitchen Exhaust & Supply

NC-v4 EAp2: Minimum Energy Performance
posted by Junaid Mujahid on Feb 13, 2025, 3:51 am

Hi Everyone,

A project I'm modelling has a MAHU supplying 1800 l/s of Outdoor Air to the kitchen area to compensate for the 2000 l/s exhaust from the kitchen ecology unit. I have two...

Last reply: Tyler Thumma, Feb 21, 2025, 11:27 am

Service Water Heating with Solar Collectors

NC-v4 EAp2: Minimum Energy Performance
posted by Junaid Mujahid on Jan 29, 2025, 6:55 am

Hi Everyone,

A project I'm working on has Solar Collectors as a primary source of service water heating with electric heaters for backup. I had modeled the service water heating electric...

Last reply: Junaid Mujahid, Feb 21, 2025, 12:01 am

Skylight > 5% of roof area

NC-v4 EAp2: Minimum Energy Performance
posted by Junaid Mujahid on Nov 27, 2024, 8:40 am

If the skylight area is greater than 5% of the...

Last reply: Marcus Sheffer, Feb 13, 2025, 12:34 pm

Does it have to be EXISTING infrastructure?

ND-Plan-v4 SLLp1: Smart location
posted by Jeanne Davidson on Dec 19, 2024, 6:45 am

For this pre-requisite, we are developing a materplan where the buildings will be compliant with Option 4 once they are built. But they are not there yet and we are in the middle of a desert. Can...

LEED boundary for a railway station

NC-2009 PIf1: Minimum Program Requirements
posted by Juan Sergio Simborio on Feb 28, 2015, 9:12 am

LEED NC 2009

Our project is a major railway station in Qatar. The shape of the...

Last reply: Anurag Ghosh, Dec 18, 2024, 11:28 pm

Partially designed HVAC system

CS-v4 EAp2: Minimum Energy Performance
posted by Junaid Mujahid on Dec 6, 2024, 3:33 am

I'm creating a PRM energy model for a Mall project which is a Core & Shell project in LEED v4. 

The project has some spaces with partially designed HVAC systems. For example, a Fresh...

Last reply: Marcus Sheffer, Dec 6, 2024, 9:51 am