Log in
Forum » Brazil
Topic

Storage location

NC-v4 MRp1: Storage and Collection of Recyclables
posted by Maiz Rech on Sep 11, 2023, 1:33 pm

Is there a minimum distance or positioning requirement for this area?

Would it be a problem to locate the recyclables storage on the building underground floor?

Last reply: Thomas Lagarde, Mar 22, 2024, 2:28 pm

Building Product Disclosure and Optimization required documentation

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Marcelo Alencar Pereira on Mar 15, 2024, 10:49 am

Do I need to submit the purchase invoice or any other documentation confirming product acquisition when applying for Building Product Disclosure and Optimization credits on LEED Online? If not...

Last reply: Marcelo Alencar Pereira, Mar 18, 2024, 2:48 pm

Collection rainwater area outside the boundary- SS Rainwater Management

NC-v4.1 SSc4: Rainwater management
posted by Juliana Candido on Mar 15, 2024, 4:38 pm

We are working on a project whose LEED Boundary covers the whole exterior area of the site, but there is an existing building that will not be altered. We have the rainwater collection area on...

Can I obtain the Access to Quality Transit in multiple buildings sharing a main controlled entrance?

NC-v4.1 LTc5: Access to quality transit
posted by Zabdi Valdez on Mar 14, 2023, 6:01 pm

I'm working with an industrial park with multiple buildings (5) individually certified which has two bus stops located within 1/4 mile of the main entrance and enough bus trips. The park has an...

Last reply: David O'Connell, Jan 31, 2024, 4:25 am

Glare-control: buildings with skylight

CS-v4.1 EQc4: Daylight
posted by Daniela Corcuera on Dec 18, 2023, 9:17 am

Hello!

I am analysing a warehouse building where the daylight is through skylight in a high ceiling.

The reference guide states "manual glare-control devices, such as blinds, are...

BPDO Credits: Is there a minimum limit on quantity/percentage of products from the same CSI class that I have to implement?

NC-v4.1 MRc2: Environmental Product Declarations
posted by Marcelo Alencar Pereira on Nov 12, 2023, 1:25 pm

Hello LEEDers!

In the Building Product Disclosure and Optimization credits of LEED BD+C (v4 or v4.1), is there a minimum percentage or quantity requirement for each product that must be...

Last reply: Mike Refsland, Nov 13, 2023, 3:19 pm

Pre-cast concrete structure environmental product declarations

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Maiz Rech on Sep 11, 2023, 2:17 pm

Considering the building is built of a precast concrete...

Definitions for a lab/office building

NC-v4 LTc7: Reduced parking footprint
posted by Maiz Rech on Sep 7, 2023, 9:56 am

Hello!

I'm working on a lab/office building (3800 sq meters, 1 office floor and 2 lab floors). The building will be used only by the company that owns it, the lab and offices won't be...

Plug loads for server rooms

NC-2009 EAp2: Minimum Energy Performance
posted by MARCIO OROFINO on Apr 22, 2015, 4:39 pm

Hi.
I am working for this project - a small one-floor office building, which has a 14 m2 server room. The project for the server room has not been developed yet - there will be a specific...

Last reply: Jean Marais, Mar 14, 2023, 4:39 am

Hotel Resort- multiple blocks as a "single building"

Hospitality-NC-v4 MPR3: Must comply with project size requirements
posted by A&L SUSTENTABILIDADE on Nov 25, 2022, 2:36 pm

Our project is a Hotel Resort, consisting of the main admin building, apartment blocks, individual villas, spa blocks, utility blocks, restaurants, multipurpose buildings, etc.  

According...

Last reply: steven Leonardo, Nov 26, 2022, 5:49 am