Pre-cast concrete structure environmental product declarations

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Maiz Rech on Sep 11, 2023, 2:17 pm

Considering the building is built of a precast concrete...

Storage location

NC-v4 MRp1: Storage and Collection of Recyclables
posted by Maiz Rech on Sep 11, 2023, 1:33 pm

Is there a minimum distance or positioning requirement for this area?

Would it be a problem to locate the recyclables storage on the building underground floor?

Last reply: Maiz Rech, Sep 11, 2023, 2:00 pm

Definitions for a lab/office building

NC-v4 LTc7: Reduced parking footprint
posted by Maiz Rech on Sep 7, 2023, 9:56 am

Hello!

I'm working on a lab/office building (3800 sq meters, 1 office floor and 2 lab floors). The building will be used only by the company that owns it, the lab and offices won't be...

Can I obtain the Access to Quality Transit in multiple buildings sharing a main controlled entrance?

NC-v4.1 LTc5: Access to quality transit
posted by Zabdi Valdez on Mar 14, 2023, 6:01 pm

I'm working with an industrial park with multiple buildings (5) individually certified which has two bus stops located within 1/4 mile of the main entrance and enough bus trips. The park has an...

Plug loads for server rooms

NC-2009 EAp2: Minimum Energy Performance
posted by MARCIO OROFINO on Apr 22, 2015, 4:39 pm

Hi.
I am working for this project - a small one-floor office building, which has a 14 m2 server room. The project for the server room has not been developed yet - there will be a specific...

Last reply: Jean Marais, Mar 14, 2023, 4:39 am

Hotel Resort- multiple blocks as a "single building"

Hospitality-NC-v4 MPR3: Must comply with project size requirements
posted by ARES on Nov 25, 2022, 2:36 pm

Our project is a Hotel Resort, consisting of the main admin building, apartment blocks, individual villas, spa blocks, utility blocks, restaurants, multipurpose buildings, etc.  

According...

Last reply: steven Leonardo, Nov 26, 2022, 5:49 am

Recycling rate of construction and demolition waste

CS-v4 MRc5: Construction and demolition waste management
posted by Tiago Rigobello on Nov 4, 2022, 5:08 pm

How can we prove the recycling rate of construction and demolition waste made by the recycler? What are the options in Brazil?

Thanks! Best regards!

Bird collisions/Interference in the migratory route

CS-v4 INc1: Innovation
posted by Ricardo Gomes on Mar 8, 2021, 8:34 pm

I’m curious if there is a pattern flight height for migratory birds. Our project is close to a large road network, with a lot of green area and along a flight corridor, landing, resting, feeding...

Last reply: Celeste Ceballos, Aug 22, 2022, 7:11 pm

Tier 1: On-site renewable energy generation- excluded from LEED Boundary

NC-v4.1 EAc5: Renewable energy
posted by ARES on May 17, 2022, 10:55 am

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5783 thumbs up May 17, 2022- 11:47 am Technically it is Tier 2. Wondering if there is a creative way to draw the project boundary to include it however? That is a question for a different forum I suppose. Log in or register to post comments ...

Last reply: Marcus Sheffer, May 17, 2022, 11:47 am

WEp2- add shower to awarded credit

NC-v4 WEp2: Indoor water use reduction
posted by ARES on Mar 29, 2022, 4:45 pm

During the Design Review, we have submitted the LT pre-requisite/credit Indoor Water Use Reduction and we have earned a total of 6 points. We are now going to submit the Construction Phase and we...