Compliance to Type III PS EPDNC-v4.1 MRc2: Building product disclosure and optimization - environmental product declarationsposted by Melinda Orova on Mar 4, 2021, 8:02 am
Hi everyone! Hope you're doing great. I'd like to ask if the following EPD fulfills the requirement of Type III EPD PS with external verification? Thanks a lot! ... |
|
ASHRAE Standard for Hospitality projectHospitality-NC-v4 EAp2: Minimum Energy Performanceposted by Nikos Tsitsikas on Mar 4, 2021, 7:50 am
Hi all, We are working on a v4 Hospitality project which consists of various single-storey bungalows. Would you please advise on which ASHRAE Standard should be used? Would that be 90.1 or... |
|
Single-zone System (exception 'b' to G3.1.1) dealing withNC-v4 EAc2: Optimize Energy Performanceposted by Ale g on Mar 2, 2021, 8:24 am
How do you deal with exception (b) to G3.1.1? Do you apply a single-zone system (1) to spaces that have a COOLING or HEATING PEAK LOADS that differ more than 31.2 W/m2 to other spaces... Last reply: Ale g, Mar 4, 2021, 3:15 am |
|
baseline ventilation rate for DOAS systemNC-v4 EAp2: Minimum Energy Performanceposted by X. Chen on Mar 3, 2021, 8:30 pm
Hi, we have a DOAS system in the design and our baseline system is Sys#8,... |
|
Interior Lighting Dimming controls in Multi-use spacesNC-v4 EQc6: Interior lightingposted by Summer Gorder on Mar 3, 2021, 5:20 pm
The interior lighting of our projects has 3 zones for dorm rooms, but has dimming with manual on/ automatic off controls. There are also daylight zones. Can the dimming meet the 3 lighting levels... Last reply: Glenn Heinmiller, Mar 3, 2021, 6:54 pm |
|
Elevators in the ProposedNC-v4.1 EAp2: Minimum Energy Performanceposted by Isabel Santos on Feb 26, 2021, 2:59 pm
I am currently computing the elevators' energy consumption in the baseline according to Table G3.1, section 16. After assessing the total peak elevator motor power per car, as Design Builder (... Last reply: Marcus Sheffer, Mar 3, 2021, 10:55 am |
|
Decentralized PM measuring devices permanent installationNC-v4.1 EQc4: Indoor air quality assessmentposted by Sascha Krause on Mar 3, 2021, 9:48 am
Hello all, It's first time that I work with LEED regulations and can't find something about permament installation of PM measuring devices and whether installed devices can improve the... |
|
Construction cost increaseLEED v4.1 Discussion Forumposted by Davide Liviero on Mar 3, 2021, 9:44 am
Hello everyone, I am preparing a preliminary study for a hospital that we are aiming at certifying LEED v4.1 Gold. I have been given the task to predict the variation in terms of cost of... |
|
Water Performance Metering in a complexEBOM-v4.1 WEc1: Water Performanceposted by Monica Chavez on Mar 2, 2021, 5:45 pm
Hello, I am working in a project located in a complex that is pursuing the LEED... |
|
Addressing non-applicable categories in the matrix.Pilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by Michelle Rosenberger on Mar 1, 2021, 7:27 pm
Hello everyone, We recently got a review comment back on this credit saying that not all the information has been provided for end-of-life/Reuse or Product Maintenance in the matrix. We... Last reply: Olga Yuil, Mar 2, 2021, 7:13 pm |