Parking spaces

NC-v4 LTc7: Reduced parking footprint
posted by David O'Connell on Mar 28, 2024, 5:13 am

Hi All,

Working on a project that is part of larger campus it is only a single building that is being certified. There is a seperate parking lot where there is no plan on designing new...

Smoking Rules within construction project boundaries

NC-v4 EQc3: Construction indoor air quality management plan
posted by Marine Petrosyan on Mar 28, 2024, 2:39 am

Hi, All!

We are currently facing two major questions during the work with the construction project team. 

1. How does LEED treat electronic cigarettes? Is it prohibited the same way...

Residential clothes washers

CS-v4 WEp2: Indoor water use reduction
posted by Vanessa Montezuma Ramos on Mar 28, 2024, 12:12 am

Hi everyone, 

We are currently trying to certify a residential project and during the final preliminary review, it was noted that we have a laundry room with spaces for clothes washers. Is...

Surface Reflectivity with LRV Value

NC-v4.1 EQc6: Interior lighting
posted by Nohemi Mena on Mar 27, 2024, 6:33 pm

Hello!

Has anyone succesfully certified a project under the Interior Lighting v4.1 - Surface Reflectivity requirements by documenting the interior finishes plan and the wall painting...

Exterior concrete curing compound

NC-v4 EQc2: Low-emitting materials
posted by akshaya bhaskar on Mar 27, 2024, 12:40 pm

we are working on a project under LEEED V4 BD&C, does the exterior concrete curing compound (to be used on the exterior slabs) need to meet the...

Last reply: akshaya bhaskar, Mar 27, 2024, 1:56 pm

LEED AP Exam Question

NC-v4 LTc6: Bicycle facilities
posted by zoey ying on Mar 26, 2024, 9:53 pm

A developer for a residential project in an urban area is reviewing potential sites that would reduce vehicle distance traveled. Which site would help with this goal and with achieving LT Credit...

Collected rainwater used for flush fixtures (toilets)

CS-v4.1 SSc4: Rainwater management
posted by Sofía Rizo on Mar 26, 2024, 3:26 pm

The new v4.1 requirements for credit Rainwater Management - option 1, state that "The percentile event volume must be retained (i.e. infiltrated, evapotranspirated, or collected and...

LEED certification for advanced construction process

LEED Rating System Selection
posted by Glenn Roosen on Mar 26, 2024, 8:40 am

Good afternoon,

I have a question regarding a project that is in the end phase of the construction works (final delivery of the building in September 2024), and they would like to see if a...

No Cooling Tower ACP Feedback

Pilot-Credits WEpc94: No Cooling Tower
posted by on Mar 25, 2024, 4:02 pm

I found this pilot credit to be a great way to allow projects to earn credit for the design choice of choosing not to utilize cooling towers on the project even for buildings that are large...

Walk off mats for skyway entrance

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by SIG - Sustainability Main Account on Mar 22, 2024, 2:34 pm

Would a skyway, those elevated walkways between buildings popular in Minneapolis, be considered a "...

Last reply: Talia Mamayek, Mar 22, 2024, 4:16 pm