Topic | Recent |
---|---|
Smoking policy required in countries where workplace smoking is not permitted by lawCS-v4 EQp2: Environmental tobacco smoke controlposted by Rachael McGinley on Apr 25, 2024, 5:11 am
Hi, i've had a very good question from a client. Why does LEED require a no-smoking policy in countries where workplace smoking is not permitted by law? Has anyone provided a reference to... |
|
Credit numbersLEED v5 BD+C/ID+C: Overall and Appendix Public Commentsposted by Michelle Robinson Schwarting on Apr 25, 2024, 4:10 am
For the 94% of the world that do not have English as their native language, the LEED consultants typically translate the LEED scorecard into their native language. When developers work with... |
|
Thermal Comfort Strategies for Factory Project: Leed Certification QueryNC-v4.1 EQc5: Thermal comfortposted by Alefiya Bhiwandiwala on Apr 25, 2024, 3:19 am
Hello everyone, We're currently working on a factory project that includes both... |
|
Water Reduction- Combi Oven requirementNC-v4.1 WEc2: Indoor water use reductionposted by mika sundberg on Apr 24, 2024, 11:24 am
We are working on a community building with a commisarry kitchen program. Our kitchen consultant cannot find a combi oven, that is accessible that meets the LEED requirements. Does anyone have a... |
|
Who is the owner if its a big entity with a top management board?NC-v4.1 EQp2: Environmental tobacco smoke controlposted by Dina El-Sady on Apr 24, 2024, 9:46 am
I wonder what is the definition of the project/building owner if the project is property of a large private sector corporation? Last reply: Emily Purcell, Apr 24, 2024, 10:42 am |
|
Certification of offshore buildings?NC-v4.1 MPR1: Must be in a permanent location on existing landposted by Mazin Hakim on Apr 24, 2024, 5:32 am
Hello, I am working on a unique project that is going to be constructed on purpose-built FIXED and PERMANENT platforms in the sea, about 30 miles from the shoreline. The project is mainly... |
|
Fuel type for system-5 Packaged system with reheatNC-v4.1 EAp2: Minimum Energy Performanceposted by John on Apr 24, 2024, 2:21 am
Hi Folks, I am working on an energy model for non-residential building. The baseline system would be system-5 Packaged system with reheat. As per ASHRAE 90.1 Table G3.1.1B, the heating... Last reply: Tyler Thumma, Apr 24, 2024, 11:36 am |
|
TBLA Calculation of Cx SavingsPilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysisposted by Candice Rogers on Apr 23, 2024, 10:15 pm
Hello - one of the newer features of Autocase is the calculation of... |
|
Existing fixture with no data availableCI-v4 WEp1: Indoor water use reductionposted by Julie Hardy on Apr 23, 2024, 3:48 pm
Hello, We have a CI project within an existing building. We are replacing nearly half of the plumbing fixtures, but we still have old toilets and faucets with no available information.... |
|
SSc Enahnced resilient site designLEED v5 BD+C/ID+C: Sustainable Sites Public Commentsposted by Emily Purcell on Apr 23, 2024, 11:55 am
I like the overall... |