LEED V4.1 O&M Precertification denied.

LEED v4.1 Discussion Forum
posted by shashank gangil on Feb 26, 2024, 10:32 pm

Dear,

I recently enrolled a project on LEED online for LEED V4.1 O&M. We are going for Pre-Certification First.

For Pre-certification of LEED v4.1 O&M, we need to fill a...

Waste performance yields a score of zero points in ARC

EBOM-v4.1 MRp3: Waste Performance
posted by jimmy Adames on Feb 26, 2024, 1:50 pm

Hi, Our building is a very automated distribution center for an apparel company.  Due to the nature of the business, we receive cardboard cases with product and before it ships to customers, all...

One-time air testing: how to enter readings in the ARC platform

EBOM-v4.1 EQp4: Indoor Environmental Quality Performance
posted by jimmy Adames on Feb 26, 2024, 1:35 pm

Greetings, I have a few questions regarding this credit.

  1. We have a large Distribution center and are taking CO2...

How outdoor water is calculated for green walls (vertical vegetations)?

NC-v4 WEp1: Outdoor water use reduction
posted by Leo LeQuoc on Feb 25, 2024, 6:24 pm

Our team is working with a new construction project where design team wants to apply green walls (vertical vegetations) outside the building facade. As LEED calculator only defines vegetation on...

Serious(ly) Newb Question: ASHRAE 90.1,

LEED v4.1 Discussion Forum
posted by on Feb 25, 2024, 1:41 am

Hi Folks,

I am the poor slob (AKA apprentice) tasked with sorting out the credit our local electrical utility will allow for a lighting project of a commercial bldg outside parking lot....

Minimum OA Options

EBOM-v4.1 EQp1: Minimum Indoor Air Quality
posted by Courtney Mayes on Feb 23, 2024, 3:59 pm

Hello,  I have a site that has a shared OAD for two units.  The duct is not large enough to supply the minimum OA, and one of the spaces have changed usage.  Even with reduced CFM per occupant...

Last reply: Dave Hubka, Feb 24, 2024, 8:14 pm

WEpc115 calculator

Pilot-Credits WEpc115: Whole Project Water Use Reduction
posted by Clive Lacey on Feb 22, 2024, 4:18 pm

Hi all,

Does anyone know the procedure for calculating the Baseline for "process load" and "HVAC" in the WEpc115 calculator? 

Does an entire warehouse have to be heated to qualify for LEED EBOM

Warehouses-EBOM-v4 EAp2: Minimum Energy Performance
posted by Ralph Bicknese on Feb 22, 2024, 3:30 pm

I did not receive any replies on my previous post so I am restating the issue.  To meet...

Previously developed land

Warehouses-NC-v4 LTc4: Surrounding density and diverse uses
posted by Rebekah Brown on Feb 22, 2024, 3:01 pm

Hi,

My current project is going to be built on a previously developed parking lot. It was mainly used to hold construction vehicles. For option 1 of this credit it requires the previously...

Last reply: Deborah Lucking, Feb 23, 2024, 11:37 am

LEED O+M as an alternative to ASHRAE level 1 audit

EBOM-v4 EAp1: Energy Efficiency Best Management Practices
posted by Katherine Ann Resurreccion on Feb 21, 2024, 8:12 pm

Hi to everyone, 

if the project is pursuing LEED 0+M, can it be an alternative to ASHRAE level 1 audit? or if the project is pursuing LEED O+M, using ASHRAE level 1 will be considered as...