Topic | Recent |
---|---|
Parking Ventilation ACP EuropeCS-v4 EQp1: Minimum indoor air quality performanceposted by Samuel Sura on Feb 21, 2018, 3:36 am
Hi, can someone please explain what Standard should be used to determine the minimum ventilation rate for parking area for projects located outside the USA, specifically Europe? Option 2... Last reply: Andrew Mitchell, P.E., Dec 19, 2023, 11:35 am |
|
Option 1: Climate Related Risk Management Planning StepPilot-Credits IPpc98: Assessment and planning for resilienceposted by Marina Rullo on Oct 27, 2023, 1:04 pm
Our firm pursued this credit for a project site in Baltimore, MD. I found that the prerequisite and Option 1 overlap a great deal, especially when they are presented in the same worksheet. In the... Last reply: Lisa Bolle, Dec 19, 2023, 11:22 am |
|
No Cooling TowerNC-v4.1 WEc3: Optimize Process Water Useposted by Azra Semic on Jun 14, 2023, 8:10 am"Option 2. Optimize Water Use for Cooling" if they meet the eligibility criteria described in the Step-by-Step Guidance. In another forum on this matter titled "No Cooling Tower option... Last reply: Brittany Garneau, Dec 19, 2023, 8:21 am |
|
How to justify that a parking garage is ventilated enough?EBOM-v4 EQp1: Minimum indoor air quality performanceposted by Joan Mora Juvanteny on Dec 19, 2023, 7:46 am
Hello, We have some problems to justify that an exterior parking with a covered part meets the Table 6.5 minimum exhaust requirements. The covered part is one-side opened so we can't apply... |
|
Optimize Process Water Use, Option 2 with ASHRAE 90.1 2010 model?NC-v4.1 WEc3: Optimize Process Water Useposted by Deb Favaretto on Nov 9, 2021, 2:37 pm
We are submitting a LEED v4 BD+C NC project with LEED v4.1 upgrades on a credit-by-credit basis. Minimum and Optimize Energy Performance have remained v4. We are interested in pursuing the v4.1... Last reply: Brittany Garneau, Dec 19, 2023, 8:06 am |
|
Multilevel lighting controlNC-v4.1 EQc6: Interior lightingposted by Michael on Jun 26, 2022, 11:55 pm
I have 10 lighting fixtures in an office space, and the architect is providing 3 on-off switches: - switch 1, on-off 5 lightings (50% of lighting numbers) - switch 2, on-off 2... Last reply: Karen Joslin, Dec 18, 2023, 12:51 pm |
|
3rd Party Verified Manufacturer Inventory & Product Lens?NC-v4.1 MRc4: Material Ingredientsposted by Katrina Kashinejad on Dec 8, 2023, 12:37 pm
Hello, I'm looking for confirmation on what counts as 3rd Party Verification for these two types of Material Ingredient Reports:
Last reply: Lauren Richardson, Dec 18, 2023, 11:43 am |
|
Ownership of Attributes: On-Site PV with Utility ProgramNC-v4.1 EAc5: Renewable energyposted by Summer Minchew on Dec 15, 2023, 9:26 am
The LEEDonline form for this credit requires us to, "Upload On-site Renewable Energy Systems...Contract and evidence of renewable attribute ownership.
Last reply: Marcus Sheffer, Dec 18, 2023, 10:00 am |
|
Glare-control: buildings with skylightCS-v4.1 EQc4: Daylightposted by Daniela Corcuera on Dec 18, 2023, 9:17 am
Hello! I am analysing a warehouse building where the daylight is through skylight in a high ceiling. The reference guide states "manual glare-control devices, such as blinds, are... |
|
Understanding Pilot-Credits IPpc101Pilot-Credits IPpc101: Integrative processposted by Fatimah Razak on Dec 16, 2023, 8:55 pm
Dear forum members, I'm looking to gain a better understanding of Pilot-Credits IPpc101 and thought I'd reach out to this knowledgeable community. From what I've gathered, Pilot-Credits... |