Bank Entrance Separate from Building EntranceEBOM-2009 IEQc3.5: Green cleaning - indoor chemical and pollutant source controlposted by Chris Munn on Jul 1, 2010, 1:01 pm
I am working with a builidng that has a main entrance into the building with 10 feet of matting, however they have a first floor tenant that is a bank with its own independent entryway from the... Last reply: John Beeson, Aug 20, 2010, 1:01 pm |
|
calculating the floor areaNC-2009 IEQc8.1: Daylight and views - daylightposted by Emmanuel Pauwels on Jul 1, 2010, 8:23 am
When calculating the floor area for this credit in a residential kitchen, what surface do we actually count? Considering there is one wall with a regrigerator integrated, some cabinets and a... Last reply: Eddy Santosa, Jul 2, 2010, 12:57 am |
|
IEQP1 Natural Ventilation- Outdoor air qualityNC-2009 IEQp1: Minimum indoor air quality performanceposted by Carrie Lai on Jul 1, 2010, 3:17 am
I am doning a new project, and using natural ventilation for one of the rooms. I do read carefully the requirements of IEQP1, but the LEED Guide does not require outdoor air quality test if... Last reply: Carrie Lai, Jul 1, 2010, 11:09 pm |
|
Check MPRsGeneral forumsposted by Tristan Roberts on Jun 30, 2010, 10:28 pm
Summer, if you haven't already, I recommend reviewing LEED's Minimum Program Requirements for background on some rules... |
|
LEED rating system selection policy- schoolsGeneral forumsposted by Tristan Roberts on Jun 30, 2010, 10:22 pm
Denise, that depends on the specifics of the schools project—what grade level and how much of it is learning space. Check out the LEED... |
|
Interior Light Fixture exemption- no direct line of siteEBOM-2009 SSc8: Light Pollution Reductionposted by John Ida on Jun 30, 2010, 9:25 pm
Our building is a warehouse with only a single string of clerestory windows at the peak of a gabled roof. All interior light fixtures are ceiling hung T-8s that are 10-12 feet below the bottom... |
|
Enhanced CommissioningCS-2009 EAc3: Enhanced Commissioningposted by James Thornton on Jun 30, 2010, 6:34 pm
I have a question and a comment. The question first: Is the cost per square foot fee mentioned in the article for Enhanced... Last reply: James Thornton, Jul 5, 2010, 6:09 pm |
|
leed NC v3 process energyNC-2009 EAp2: Minimum Energy Performanceposted by NASSER A F ALMUSAEED on Jun 30, 2010, 5:34 pm
Hi , Last reply: Christopher Schaffner, Jul 13, 2010, 9:39 am |
|
IEQ Credit 4.2- Low VOC paints & coatingsCI-2009 IEQc4.2: Low-emitting materials - paints and coatingsposted by Leo van Veldhuizen on Jun 30, 2010, 5:04 pm
We have a project that has Marshfield Door Systems with a "Enviroclad UV" factory applied finish. Marshfield on their website states this is a low voc finish system. When I asked for... Last reply: Tristan Roberts, Jul 1, 2010, 10:28 pm |
|
Alternative Compliance ApproachEBOM-2009 MRc7: Solid waste management - ongoing consumablesposted by Richard Navarro on Jun 30, 2010, 12:51 pm
Hi I was wondering if it was possible to document the solid waste management for both ongoing and durable goods in an alternative way. The problem we are encountering is that we are trying to... Last reply: Dan Ackerstein, Jun 30, 2010, 1:21 pm |