Bank Entrance Separate from Building Entrance

EBOM-2009 IEQc3.5: Green cleaning - indoor chemical and pollutant source control
posted by Chris Munn on Jul 1, 2010, 1:01 pm

I am working with a builidng that has a main entrance into the building with 10 feet of matting, however they have a first floor tenant that is a bank with its own independent entryway from the...

Last reply: John Beeson, Aug 20, 2010, 1:01 pm

calculating the floor area

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Emmanuel Pauwels on Jul 1, 2010, 8:23 am

When calculating the floor area for this credit in a residential kitchen, what surface do we actually count? Considering there is one wall with a regrigerator integrated, some cabinets and a...

Last reply: Eddy Santosa, Jul 2, 2010, 12:57 am

IEQP1 Natural Ventilation- Outdoor air quality

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Carrie Lai on Jul 1, 2010, 3:17 am

I am doning a new project, and using natural ventilation for one of the rooms. I do read carefully the requirements of IEQP1, but the LEED Guide does not require outdoor air quality test if...

Last reply: Carrie Lai, Jul 1, 2010, 11:09 pm

Check MPRs

General forums
posted by Tristan Roberts on Jun 30, 2010, 10:28 pm

Summer, if you haven't already, I recommend reviewing LEED's Minimum Program Requirements for background on some rules...

LEED rating system selection policy- schools

General forums
posted by Tristan Roberts on Jun 30, 2010, 10:22 pm

Denise, that depends on the specifics of the schools project—what grade level and how much of it is learning space. Check out the LEED...

Interior Light Fixture exemption- no direct line of site

EBOM-2009 SSc8: Light Pollution Reduction
posted by John Ida on Jun 30, 2010, 9:25 pm

Our building is a warehouse with only a single string of clerestory windows at the peak of a gabled roof. All interior light fixtures are ceiling hung T-8s that are 10-12 feet below the bottom...

Enhanced Commissioning

CS-2009 EAc3: Enhanced Commissioning
posted by James Thornton on Jun 30, 2010, 6:34 pm

I have a question and a comment. The question first:

Is the cost per square foot fee mentioned in the article for Enhanced...

Last reply: James Thornton, Jul 5, 2010, 6:09 pm

leed NC v3 process energy

NC-2009 EAp2: Minimum Energy Performance
posted by NASSER A F ALMUSAEED on Jun 30, 2010, 5:34 pm

Hi ,
for a printing company
if per example we have 100kw of energy use for the hvac lighting and building system and a 100 kw of energy use for the printing machinery and we save 50...

Last reply: Christopher Schaffner, Jul 13, 2010, 9:39 am

IEQ Credit 4.2- Low VOC paints & coatings

CI-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Leo van Veldhuizen on Jun 30, 2010, 5:04 pm

We have a project that has Marshfield Door Systems with a "Enviroclad UV" factory applied finish.

Marshfield on their website states this is a low voc finish system. When I asked for...

Last reply: Tristan Roberts, Jul 1, 2010, 10:28 pm

Alternative Compliance Approach

EBOM-2009 MRc7: Solid waste management - ongoing consumables
posted by Richard Navarro on Jun 30, 2010, 12:51 pm

Hi I was wondering if it was possible to document the solid waste management for both ongoing and durable goods in an alternative way. The problem we are encountering is that we are trying to...

Last reply: Dan Ackerstein, Jun 30, 2010, 1:21 pm