Log in
Forum
Topic

Setting a LEED boundary

CS-2009 SSc5.2: Site development - maximize open space
posted by javier bolanos zeledon on Dec 1, 2010, 2:57 pm

I have a CS project within a large area of future grow. There will be three different buildings on site. The only one pursuing LEED certification is this CS. There will be a central chiller plant...

Last reply: Tristan Roberts, Dec 7, 2010, 11:08 am

R-22

CS-2009 EAp3: Fundamental Refrigerant Management
posted by John Chyz on Dec 3, 2010, 2:26 pm

Is R-22 compliant with the requirements of EAp3?

Last reply: Scott DeGaro, Dec 6, 2010, 7:10 am

Meeting 62.1 requirements

CS-2009 IEQp1: Minimum indoor air quality performance
posted by javier bolanos zeledon on Nov 7, 2010, 8:28 pm

According to 5.10.1 you should have a relative humidity of no more than 65%. And you have to analyze this with outdoor air at humidification design conditions (design dew point and mean...

Last reply: javier bolanos zeledon, Dec 2, 2010, 10:54 pm

Occupant Number for Systems Design vs LEED Credits

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Terry Gorski on Nov 4, 2010, 12:34 pm

For a major renovation project, is it acceptable to use a much larger occupant number for the HVAC systems design and number of fixtures based on usable square footage and then use the much...

Last reply: Roger Chang, Dec 2, 2010, 8:57 pm

Complying with 62.1 in an Undergroung Garage

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Patrik Lazzari on Oct 22, 2010, 5:46 pm

I’m helping out a project team in Italy with their LEED project. This is a mid-rise residential building that has a 2-story underground parking garage. It has, besides the main entrances (...

Last reply: Roger Chang, Dec 2, 2010, 8:49 pm

Using Option 4

NC-2009 SSc4.4: Alternative transportation - parking capacity
posted by Deborah Lucking on Dec 1, 2010, 8:05 pm

Requesting some guidance in submitting for this credit using Option 4...
We have the ITE report; do we just download the relevant pages and somehow correlate that to the number of parkings...

Last reply: David Posada, Dec 2, 2010, 7:10 pm

Fenestration and doors leakage

CS-2009 EAp2: Minimum Energy Performance
posted by javier bolanos zeledon on Dec 1, 2010, 3:10 pm

According to Ashrae 90.1 5.4.3.2 air leakage for fenestration and doors shall be determined in accordance with...

Last reply: javier bolanos zeledon, Dec 2, 2010, 12:04 pm

Option 2 prescriptive

CS-2009 IEQc8.1: Daylight and views - daylight
posted by Sofia Nordström on Nov 19, 2010, 4:17 am

Hi, I’m working with a CS project and we have chosen to go for Option 2, the prescriptive path. My issue is that the project consists of an 8 story square building with a large skylight and...

Last reply: Eddy Santosa, Dec 1, 2010, 9:12 pm

Location of hardscape areas

NC-2009 SSc5.2: Site development - maximize open space
posted by Laurie Hammack on Dec 1, 2010, 7:34 pm

In reading the wording for this credit under 2009 NC, it mentions for all cases that "projects in urban areas that earn SS Credit 2: Development Density and Community Connectivity, pedestrian-...

Last reply: Devon Bertram, Dec 1, 2010, 7:55 pm

Same here. Its been about 15

General forums
posted by Patrick Jones on Dec 1, 2010, 2:02 pm

Same here. Its been about 15 minutes for me and don't see a confirmation email yet.

Last reply: Batya Metalitz, Dec 1, 2010, 2:24 pm