Design Case vs Baseline Case

CS-2009 WEp1: Water Use Reduction
posted by Biagio Arevalo on Nov 26, 2010, 5:55 pm

I´m working on the template and I want to know if in the baseline case I input the conventional public lavatory faucet of 0.5 gpm can I input for the desing case 0.25 gpc of the metering faucets...

Last reply: Tristan Roberts, Dec 7, 2010, 10:28 pm

Links between Credits and Exemplary Performance

NC-2009 IDc1: Innovation in Design
posted by Lauren Sparandara on Dec 1, 2010, 1:35 pm

I just wanted to report that I have had many problems with finding my documented exemplary performance credits in the pull down menu under the ID credit section. I could upgrade all my BETA forms...

Last reply: Tristan Roberts, Dec 7, 2010, 10:26 pm

Courtyard Classrooms

Schools-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Lisa Logan on Nov 16, 2010, 6:52 pm

All of my classrooms are entered directly off of a courtyard. So do I really need 10' of walk off mat per classroom? If so, I am thinking I will need to punt on this one. Just looking for some...

Last reply: Tristan Roberts, Dec 7, 2010, 10:15 pm

Old building pursuing GBOM- CIR for an exception on EA1

EBOM-2009 EAc1: Optimize Energy Efficiency Performance
posted by Tom Kennedy on Oct 13, 2010, 2:18 pm

our building is really old (way older than me), contains ACM's, masonry walls with no insulation, construction of a by-gone era...... it seems unfair to compare it with EnergyStar (...

Last reply: Michael Miller, Dec 7, 2010, 9:02 pm

Public comment period extended to Jan. 11, 2011

General forums
posted by Tristan Roberts on Dec 7, 2010, 3:49 pm

for the close of 1st public comment. I accidently typed the incorrect date to Tristan for this forum. Log in or register to post comments ...

Last reply: Christina Macken, Dec 7, 2010, 4:07 pm

convert Credit to ID point

NC-2009 IDc1: Innovation in Design
posted by Crystal Brokaw on Dec 3, 2010, 11:01 am

Is it safe to assume that complying with a credit under an alternate rating system will yield an Innovation & Design point if the current rating system does not include that credit?

...

Last reply: Crystal Brokaw, Dec 7, 2010, 12:57 pm

Setting a LEED boundary

CS-2009 SSc5.2: Site development - maximize open space
posted by javier bolanos zeledon on Dec 1, 2010, 2:57 pm

I have a CS project within a large area of future grow. There will be three different buildings on site. The only one pursuing LEED certification is this CS. There will be a central chiller plant...

Last reply: Tristan Roberts, Dec 7, 2010, 11:08 am

R-22

CS-2009 EAp3: Fundamental Refrigerant Management
posted by John Chyz on Dec 3, 2010, 2:26 pm

Is R-22 compliant with the requirements of EAp3?

Last reply: Scott DeGaro, Dec 6, 2010, 7:10 am

Meeting 62.1 requirements

CS-2009 IEQp1: Minimum indoor air quality performance
posted by javier bolanos zeledon on Nov 7, 2010, 8:28 pm

According to 5.10.1 you should have a relative humidity of no more than 65%. And you have to analyze this with outdoor air at humidification design conditions (design dew point and mean...

Last reply: javier bolanos zeledon, Dec 2, 2010, 10:54 pm

Occupant Number for Systems Design vs LEED Credits

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Terry Gorski on Nov 4, 2010, 12:34 pm

For a major renovation project, is it acceptable to use a much larger occupant number for the HVAC systems design and number of fixtures based on usable square footage and then use the much...

Last reply: Roger Chang, Dec 2, 2010, 8:57 pm