Forum
Topic

Storage Rooms as Critical Zone using 62MZ Spreadsheet

NC-2009 IEQp1: Minimum indoor air quality performance
posted by James Keohane on May 2, 2011, 6:01 pm

I have received review comments from a LEED Review Team questioning the results of the 62MZ spreadsheet which identified a Storage Room as the "Critical Zone". The reviewer requests that I revise...

Last reply: Roger Chang, May 26, 2011, 9:30 am

Direct Exhaust Systems

NC-2009 IEQc3.1: Construction IAQ management plan - during construction
posted by Erik Ruoff on Jul 7, 2010, 9:21 am

Does a project where all exhaust air is exhausted directly to the outside need...

Last reply: Tristan Roberts, May 26, 2011, 7:38 am

green power- purchased percentage

CI-2009 EAc4: Green Power
posted by Andy Plogsted on May 16, 2011, 2:59 pm

Our client owns the building and occupies 50% of the square footage of a singularly metered building.

The owner (our client) signed a contract to purchase...

Last reply: Tristan Roberts, May 26, 2011, 7:32 am

Water Closet Baseline

CI-2009 WEp1: Water Use Reduction
posted by Brandon Dark on May 12, 2011, 12:48 pm

Hello,

I am working on a large LEED CI project where the tenant is occupying the majority of an existing building. The restrooms in this building prior to construction had 3.5 gpf blow-out...

Last reply: Tristan Roberts, May 25, 2011, 9:16 pm

VOC Testing

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Maya Karkour on May 6, 2011, 11:20 am

Hello,

Do you guys know if the...

Last reply: Nadav Malin, May 25, 2011, 7:19 pm

Can a PC count for Campus?

Pilot-Credits PC41: Wastewater Management
posted by Prudence Ferreira on May 24, 2011, 7:03 pm

If we were to certify a campus...

Last reply: Batya Metalitz, May 25, 2011, 12:59 pm

100% of energy generated by PVs at site--will it earn 19 points?

NC-2009 EAc1: Optimize Energy Performance
posted by Brooks Critchfield on May 18, 2011, 9:51 am

We have a project on a "campus" site with existing buildings. The Owner has installed an extensive array of PVs which are shared by buildings on this site. The array is extensive enough to...

Last reply: Brooks Critchfield, May 25, 2011, 12:03 pm

questions of Install Drift Eliminators and minimum efficiencies

Pilot-Credits WEpc17: Cooling tower water use
posted by Jie Zhang on Apr 1, 2011, 3:09 am

In the pdf download from usgbc.org, one of the credits requirements is 'install drift eliminators that achieve minimum efficiencies of 0.2% for counter-flow systems or 0.5% for cross-flow system...

Last reply: Batya Metalitz, May 25, 2011, 11:57 am

Vertical Fc at property line

NC-2009 SSc8: Light Pollution Reduction
posted by JOSH FISHER on May 25, 2011, 11:14 am

What is the height off the ground at which the vertical Fc are are to measured at the property line?

Tracking compacted trash and loose recyclables

EBOM-2009 MRc7: Solid waste management - ongoing consumables
posted by Kristen Salinas on May 4, 2011, 6:22 pm

My project is having problems tracking their trash and recyclables by volume. The trash is compacted 4:1 in a trash compactor. This trash remains in its compacted state even when it is in the...

Last reply: Dan Ackerstein, May 25, 2011, 10:00 am