Absorption Chiller- District Heating

EBOM-2009 EAp2: Minimum Energy Efficiency Performance
posted by Ralf Lehmann on Jul 1, 2011, 3:58 am

In my project there is an absorption chiller supplied by district heating. The building itself is also heated by district heating. The two district heat quantities (one for heating, one for...

Last reply: David Eldridge, Jul 5, 2011, 2:47 pm

Compliance of Clay tiles

NC-2009 SSc7.2: Heat island effect - roof
posted by Udana Ratnayake on Jul 4, 2011, 12:16 pm

We are working on a Hotel project in Sri Lanka and planning to obtain LEED certification for the facility. Hotel is to be constructed as chalets and the project team has decided to use red color...

Last reply: Louise Schlatter, Jul 5, 2011, 1:54 pm

Shading from trees planted on roof

NC-2009 SSc7.2: Heat island effect - roof
posted by Rob Hink on Jun 29, 2011, 2:56 pm

We are designing a building with a "garden lounge" on the roof. The roof will have 3 large canopy trees that will shade a significant portion of the roof. The project is in South Florida so the...

Last reply: Susann Geithner, Jul 5, 2011, 1:20 pm

Clarification for credit application

Pilot-Credits PC27: Reconcile Designed and Actual Energy Performance
posted by monu goyal on Jun 30, 2011, 2:11 am

hii, We are doing LEED - CI project, I am getting what should I submit at design stage, I can submit copy of contract, google survey and a draft M&V plan. Is this will meet the credit...

Last reply: Marcus Sheffer, Jul 2, 2011, 9:32 am

More LCA Score Questions

Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials 
posted by Dirk Kestner on Jul 1, 2011, 1:11 pm

Were Laura’s questions from April 7th ever resolved? I just input some data for a new project and am also getting a score over 100. I think that some units are off between what EC outputs and...

Epoxy Flooring

NC-2009 IEQc4.2: Low-emitting materials - paints and coatings
posted by Lauren Sparandara on Aug 23, 2010, 7:18 pm

Hey Mara (or others),

I have a lot of projects that have been asking me about epoxy flooring and recently also received a question about epoxy flooring under EQc4.3 on LEEDuser.com. I don'...

Last reply: Sylvia Schwartz, Jul 1, 2011, 11:17 am

Demand-Controlled Ventilation

CS-2009 EAc1: Optimize Energy Performance
posted by Redy Truccolo on Jun 30, 2011, 12:22 pm

Hi,

in my proposed HVAC system I want to use a demand-controlled outdoor air ventilation (with motorized dampers controlled by...

Last reply: Marcus Sheffer, Jul 1, 2011, 10:56 am

Consider footnoting Table of Required Signatories in LOv3

General forums
posted by RETIRED on Jun 30, 2011, 6:09 pm

I think Owner Required Signatories is a great addition for many of the prerequisites and credits where it is used. It has been a breath of fresh air to get owners on board with the requirements....

LEED Commissioning vs. "Total Building Commissioning" (TBCx)

NC-2009 EAc3: Enhanced Commissioning
posted by Matt Nolan on Jun 3, 2011, 6:41 pm

I am seeing more and more project requirements (for new buildings) mentioning TBCx (Total Building Commissioning)- which is based on ASHRAE Guideline 0. I'm not real familiar with it, and don't...

Last reply: Gary Shlifer MS, LEED AP BD+C, Homes, Jun 30, 2011, 12:01 pm

how to document

Pilot-Credits PC26: Advanced Energy Metering
posted by monu goyal on Jun 29, 2011, 2:32 am

hii, we are doing LEED-CI project, and we have installed submeters like BTU meter, kwh meters and also implementing EA Credit 30. Measurement and Verification. Also above of this we have BMS...

Last reply: monu goyal, Jun 30, 2011, 3:32 am