Log in
Forum
Topic

I was under the impression

General forums
posted by Bill Swanson on Aug 3, 2011, 8:48 am

Bill, for those of us reading this forum who get the car metaphor, but don't know anything about BUG ratings, is there any chance you could summarize your key suggestions here in easy-to-grasp terms?...

Last reply: Bill Swanson, Aug 29, 2011, 11:02 am

LEED Certification for Phase wise construction

General forums
posted by Ramesh Narayanan on Aug 29, 2011, 6:33 am

Nadav Malin President BuildingGreen, Inc. LEEDuser Moderator 834 thumbs up August 29, 2011- 10:06 am I've responded to this question in the MRc4 forum. Please continue the conversation there. Log in or register to post comments ...

Last reply: Nadav Malin, Aug 29, 2011, 10:06 am

Development footprint exceeding previously developed

General forums
posted by Ricardo Sobral on Aug 28, 2011, 8:11 am

LTprerequisite1- Case 1- What happens is the new development footprint exceeds the previously developed portions of the site?

% of annual rainfall treated?

NC-2009 SSc6.2: Stormwater design - quality control
posted by Kash Boodjeh on Aug 22, 2011, 3:06 pm

The reference guide states that "90% of the avg annual rainfall is equivalent to treating the runoff from 1" of rainfall for a...

Last reply: Gregory Hurst, Aug 26, 2011, 6:09 pm

Parking Lighting not through Building Elect Service

NC-2009 SSc8: Light Pollution Reduction
posted by Michelle Rosenberger on Aug 26, 2011, 4:56 pm

My project puts a new community center on an existing masterplanned campus. My LEED boundary includes new and relocated parking that serve the new building and are part of my project team's scope...

LEED CS 2009 LEED ENERGY MODEL

CS-2009 EAc1: Optimize Energy Performance
posted by John Harrington on Aug 24, 2011, 5:14 pm

My proposed system is a WSHP. However, the heat from electric exceeds the heat used from boiler in the WSHP loop.

I would condiser the primary heating source in this building to be...

Last reply: John Harrington, Aug 26, 2011, 4:45 pm

ASHRAE/eQuest question- external blinds and SHGC requirement

CS-2009 EAc1: Optimize Energy Performance
posted by Agnes Vorbrodt on Jul 17, 2011, 12:09 pm

Hello,
In a CS office building we specified...

Last reply: Marcus Sheffer, Aug 26, 2011, 3:14 pm

Can 10' requirement be met by a combination of mats?

Schools-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Renee Shirey on Aug 26, 2011, 2:58 pm

Due to space constraints, our vestibules were not able to be a full 10' wide between our doors, thus the recessed walkoff mats aren't 10'. Does anyone see any issue with supplimenting the...

Last reply: Allison Beer McKenzie, Aug 26, 2011, 3:03 pm

Peak Demand Reduction Credit NOT Demand Response

Pilot-Credits EApc8: Demand response
posted by Debra Lombard on Aug 26, 2011, 1:15 pm

HI Everyone,

I am working on a LEED-NC v2.2 project which is small but has three technologies that reduce...

Accumulating Annexes

Living with LEED Online - quirks, bugs and hiccups
posted by Paola Figueiredo, Newton Figueiredo on Aug 26, 2011, 1:08 pm

The credits seem to be accumulating annexes, for example, after uploading an annex in the templates for the SS 4.1 credit, it appears later in the following credits as an upload, even for...