Topic | Recent |
---|---|
Pilot Credit: Carbon sequestration through on site plantingNC-v4 INc1: Innovationposted by Emily Purcell on Mar 7, 2023, 11:43 amof processes, but we'll take the Innovation point. SITES also pointed us to some resources: the i-Tree Forum FAQ's (https://forums.itreetools.org/viewforum.php?f=38) and utilizing the i-Tree User Forums (https://forums.itreetools.org/index.php) to troubleshoot this issue within i-Tree's software Log in or register to post comments ... Last reply: Deborah Lucking, Feb 2, 2024, 2:59 pm |
|
REACH complianceNC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Charline SEYTIER on Dec 21, 2017, 7:01 amreferenced by Charline is not sufficient at only 1,000 ppm. Please search the LEEDuser forum for more on this. I think this question may have been a duplicate which was answered previously. Log in or register... Last reply: Aury Hathout, Feb 2, 2024, 2:36 pm |
|
Diverse uses outside the project boundary/ tenant fitout area but within the same buildingCI-v4 LTc2: Surrounding density and diverse usesposted by Ranya Metwalli Shields on Jul 4, 2019, 8:53 am
Our project is a retail tenant located within a mall. I was wondering whether shops/ restaurants within the same mall where our projectis located but outside the project boundary/ tenant fitout... Last reply: Alice Charbonneau, Feb 2, 2024, 2:02 pm |
|
Baseline Building DCVNC-v4.1 EAp2: Minimum Energy Performanceposted by Luis Andrade on Feb 2, 2024, 10:36 am
Hi everyone, I'm currently performing a PRM assessment of an Office building. ASHRAE 90.1 - 2016 has condensed in its appendix G all prescriptive information to model the Baseline building... |
|
MEPC input- Total cooling & heating capacityCS-v4 EAc2: Optimize Energy Performanceposted by Lenka Matějíčková on Jan 26, 2024, 8:20 amLenka Matějíčková Grinity s.r.o. VAT CZ04607228 LEEDuser Premium Member 1 thumbs up February 2, 2024- 4:35 am Hello again to the forum:)... any thoughts on the above? Thank you! Log in or register to post comments ... Last reply: Lenka Matějíčková, Feb 2, 2024, 4:35 am |
|
Modeling baseline DES under Option 1, Path 2- full DES performance accountingCS-v4 EAc2: Optimize Energy Performanceposted by Lenka Matějíčková on Feb 2, 2024, 4:29 am
Hi All, We are modeling an industrial plant including the plant... |
|
Difference between v4 and v4.1Pilot-Credits EApc161: Electrification ACP: Energy Simulation Performance Pathposted by Camilo Velez on Feb 1, 2024, 10:12 pm
Good evening, I have been reading about this ACP, but there are a couple of questions that I still have regarding the applicability: ASHRAE 90.1 version... |
|
Option 1 Path 2/3- Natural Ventilation and DESCS-v4 EAp2: Minimum Energy Performanceposted by Azra Semic on Feb 1, 2024, 5:09 am
Hello, |
|
Modeling indirectly conditioned spacesNC-v4 EAp2: Minimum Energy Performanceposted by Gaston Michaud on Jan 31, 2024, 6:55 pm
Hi all, We are working in a CS project, and just got back the following comment from the LEED Reviewer: The SV-A reports indicate that most of the core spaces were modeled as... |
|
Carbon Offsets & Annual deliveryCS-v4 EAc7: Green power and carbon offsetsposted by Sustainability & Commissioning on Jan 31, 2024, 4:31 pm
Hi all, On one of my Core & Shell projects, the quantity of Carbon offsets required seems to be so small that the suppliers are not willing to contract for an annual supply of the... Last reply: Marcus Sheffer, Jan 31, 2024, 5:35 pm |