Topic | Recent |
---|---|
Does Option 2. apply for underground parkingNC-v4.1 SSc5: Heat Island Reductionposted by Gwenael JAN on Apr 17, 2024, 8:14 pm
Hello, I would like to know if option 2 of SSc5 credit applies in the case of a project where the parking spaces are located underground, and therefore under the actual building. In a very... |
|
REACH and Global Green Tag certification count for the OptimizationNC-v4.1 MRc4: Material Ingredientsposted by Summer Gorder on Apr 17, 2024, 6:41 pm
Can REACH and Global Green Tag certifications count for the Optimization even if they aren't international projects? Last reply: Dave Hubka, Apr 18, 2024, 8:29 am |
|
Outdoor air in the Baseline ModelNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Apr 17, 2024, 3:06 pm
Hi , I am working on a lab space with 100% OA , for these spaces Cooling load is driving airflow, now the OA that we calculated for Proposed case is not sufficient to maintain the setpoint in the... Last reply: Rajat Wadhwa, Apr 18, 2024, 12:22 pm |
|
Process Water and ArcEBOM-v4.1 WEc1: Water Performanceposted by Jenni Betancourt on Apr 17, 2024, 10:00 am
I've been trying to communicate with Arc with no luch. We have Arc Essentials which supossedly could help us determining our potential score. Our building is industrial manufacturing, therefore... Last reply: Reshadee Weerasooriya, Apr 18, 2024, 2:31 am |
|
Benchmark GWP of Concrete > 7200 psi (402)LEED v5 BD+C/ID+C: Materials and Resources Public Commentsposted by Elaine Willis on Apr 17, 2024, 8:33 am
The Benchmark... Last reply: Elaine Willis, Apr 19, 2024, 11:11 am |
|
Would a fire sprinkler system count as "other process water"NC-v4 WEc4: Water meteringposted by Cindy Quinn on Apr 16, 2024, 9:08 pm
Has anyone had success with a fire sprinkler system being one of the subsystems? Would it count as "other process water"? TIA! Last reply: Andrey Kuznetsov, Apr 17, 2024, 2:46 am |
|
How can I download the baseline html files at different rotations? in designbuilder.LEED v4.1 Discussion Forumposted by Jhon Sariego on Apr 16, 2024, 7:47 pm
I am working on a project and I need to download the html files at different rotations in the baseline. 0, 90, 180, 270. When I run the baseline simulation in the ASHRAE section it does the... |
|
LTc Compact & ConnectedLEED v5 BD+C/ID+C: Location and Transportation Public Commentsposted by Emily Purcell on Apr 16, 2024, 2:07 pm
"The counted uses must represent at least three of the five categories, exclusive of the building’s primary use category." This language has posed a challenge for projects in v4/4.1... Last reply: Dave Hubka, Apr 16, 2024, 2:59 pm |
|
Pilot Closed- attending LEED v4.1 Optimize Process Water UsePilot-Credits WEpc94: No Cooling Towerposted by Adriana Hansen on Apr 16, 2024, 1:45 pm
This pilot credit has been used in many office projects with VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1... |
|
Pilot Closed- attending LEED v4.1 Optimize Process Water UsePilot-Credits WEpc94: No Cooling Towerposted by Adriana Hansen on Apr 16, 2024, 1:39 pm
This pilot credit allows to many office buildings that have a VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1... |