LEED certification for advanced construction processLEED Rating System Selectionposted by Glenn Roosen on Mar 26, 2024, 8:40 am
Good afternoon, I have a question regarding a project that is in the end phase of the construction works (final delivery of the building in September 2024), and they would like to see if a... |
|
Credit For Excess Chilled Water Rejected To Plant Site Chilled Water SystemNC-v4 EAp2: Minimum Energy Performanceposted by Michael Hill on Feb 14, 2024, 4:53 pm
I am working on a project that is using heat pump chillers to generate hot and cold water for the building systems. When the building loads are cooling dominated, the excess heat is rejected to... Last reply: Farooq Saeed, Mar 26, 2024, 4:29 am |
|
Dumpster sizes for the recyclables during the construction?CS-v4 MRp1: Storage and Collection of Recyclablesposted by Marine Petrosyan on Jun 29, 2023, 7:43 am
Hi, LEED Users! Can you please help me figure out, whether the dumpster sizes for the recyclables in the construction area should meet any standard under CS-v4 MRp1? I can't find... Last reply: Afogreen Build, Mar 25, 2024, 9:18 pm |
|
Is Zoysia japonica turf?NC-v4 WEp1: Outdoor water use reductionposted by Linh Dang on Dec 23, 2022, 6:17 am
Dear all LEED user expert We use Zoysia japonica for landscape. now we dont know is Zoysia turf or groundcover? if it is turf , how can i approve that is groundcover? Thanks... Last reply: Afogreen Build, Mar 25, 2024, 9:13 pm |
|
No Cooling Tower ACP FeedbackPilot-Credits WEpc94: No Cooling Towerposted by on Mar 25, 2024, 4:02 pm
I found this pilot credit to be a great way to allow projects to earn credit for the design choice of choosing not to utilize cooling towers on the project even for buildings that are large... |
|
Commercial Kitchen QueryCI-v4 EAp2: Minimum Energy Performanceposted by padma priya on Mar 7, 2024, 6:30 am
In LEED ID+C: v4 : Commericial Interior project have commercial kitchen space (Veg & Non veg), then which are the credit has been impact. Last reply: Marcus Sheffer, Mar 25, 2024, 9:48 am |
|
Industrial Process Loads and the Exceptional Calulation MethodNC-2009 EAc1: Optimize Energy Performanceposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Apr 16, 2014, 4:22 pm
We have an industrial plant where the process loads are assumed to be, say, 98% of all building energy use. Therefore, even if the non-process building portion was Net Zero Energy, we would not... Last reply: Farooq Saeed, Mar 25, 2024, 1:39 am |
|
Modeling only conditioned areaNC-v4 EAp2: Minimum Energy Performanceposted by Omar Elrawy on Dec 9, 2020, 10:05 pm
I'm certifying a huge factory with an attached office building. Is it possible to model only the office area? Last reply: Farooq Saeed, Mar 25, 2024, 1:38 am |
|
What if Question- Bathroom removed from scope, how to comply with WEp1?CI-v4 WEp1: Indoor water use reductionposted by Edgar Arevalo on Mar 21, 2024, 2:57 pm
How would a project comply with WEp1 if the bathroom was removed from scope. This is a interior fit out of part of a floor, and the common restrooms shared by the project space and the rest of... Last reply: Edgar Arevalo, Mar 22, 2024, 4:20 pm |
|
Walk off mats for skyway entranceNC-v4 EQc1: Enhanced indoor air quality strategiesposted by SIG - Sustainability Main Account on Mar 22, 2024, 2:34 pm
Would a skyway, those elevated walkways between buildings popular in Minneapolis, be considered a "... Last reply: Talia Mamayek, Mar 22, 2024, 4:16 pm |