posted by on Nov 22, 2023, 3:36 pm

Hi all, I'm having trouble finding any information on O&M: Existing Interiors.

I'm seeing O&M: Existing Buildings, Retail, Schools, Warehouses, but not O&M: Existing...

Last reply: Dave Hubka, Nov 22, 2023, 3:58 pm

Any combination of rating systems used with LEED?

LEED Rating System Selection
posted by Marine Petrosyan on Sep 14, 2023, 3:11 am

Hi, All!

I wonder if you are aware of any other smaller rating systems (particularly, energy-related, water usage-related, etc.), that you have used in combination, or separately with LEED...

LEED Pilot Credits not open for registration for v4 Core and Shell

LEED Rating System Selection
posted by Marine Petrosyan on Aug 28, 2023, 3:40 am

Hi, All!

I am not able to see registration for pilot credits for v4 Core and Shell. 

Does this mean that v4 CS does not have permission to use pilot credits, or do I do something...

Last reply: Marine Petrosyan, Aug 29, 2023, 4:46 am

Rating System Selection [ID+C or BD+C]

LEED Rating System Selection
posted by Amgad Khattab on Aug 16, 2023, 6:15 am

We have a project with the following description:

- the building is 10 floors and the owner renting the whole building.

- The Building envelope construction is complete.

-...

LEED v4 Core & Shell or Warehouse & Distribution Center

LEED Rating System Selection
posted by Laura Long on Jul 14, 2023, 4:10 pm

We are starting a new project that will designed as a C&S Warehouse.  The client's goal is to achieve LEED Silver with minimal cost.  We will be using EAp2, Option 2 for this project and the...

Last reply: Michelle Rosenberger, Jul 14, 2023, 4:24 pm

Completed fit out by owner for rentable office building- not known future tenants

LEED Rating System Selection
posted by ANGELIKI ANTONIOU on Jul 4, 2023, 9:29 am

Hello everyone!

We have a 3 storey office buidling which is designed to be rented per floor.

The tenants have not yet been determined. The architectural layout is fix (location and...

Residential High-Rise: BD+C New Construction vs. LEED Homes

LEED Rating System Selection
posted by Vitor Leite Goncalves on Jun 30, 2023, 12:56 pm

Hello all,

The project is a 6-story residential building located in the United States. USGBC website says that...

What are the mandatory major renovation activities that must be done to qualify for LEED NC for an existing building?

LEED Rating System Selection
posted by Dina El-Sady on Feb 25, 2020, 7:22 am

A building undergoing major renovation including HVAC and electric systems ,window replacements and interior changes but the exterior wall will only be painted ?Does it qualify for LEED NC?

Last reply: Dave Hubka, Jun 5, 2023, 3:46 pm

Senior cohousing

LEED Rating System Selection
posted by Gianfranco Ibarcena on Jun 2, 2023, 1:04 pm

I am developing a senior cohousing project. It has 34 permanent homes in a maximum of 3 stories buildings. It also has common areas like restaurant, gym or laundy room only for internal use and ...

Manufacturing building extension

LEED Rating System Selection
posted by Robert Yates on Jun 2, 2023, 10:36 am

I'm trying to figure out the best LEED version to use for an extension of an existing manufacturing building. It has not yet been determined if it will be open to the existing building (no walls...

Last reply: Dave Hubka, Jun 2, 2023, 11:15 am