Log in
Forum » NC-v2.2 MRc2
Loading...
Topic

LEED NC 2009 MRc2- Co-mingled Waste Recycing

NC-v2.2 MRc2: Construction Waste Management
posted by Ian McCall on Mar 31, 2014, 5:45 am

I am working in on a project in France and the project team needs a ruling to determine whether our Construction Waste Management method is conform to the LEED requirements.

A French...

Last reply: Ian McCall, Apr 1, 2014, 4:07 am

hauler receipts question

NC-v2.2 MRc2: Construction Waste Management
posted by Carrie Laurendine on Feb 13, 2014, 4:01 pm

we are documenting const. waste management for a rather large project. the contractor has hundreds of landfill/recycling plant tickets. it would be enormously time consuming to enter each of...

Last reply: Michelle Reott, Feb 14, 2014, 1:15 pm

v2.2 Construction waste management c2

NC-v2.2 MRc2: Construction Waste Management
posted by Usama Eita on Nov 30, 2013, 3:58 am

Michelle Reott Managing Principal, Earthly Ideas LLC LEEDuser Expert 613 thumbs up November 30, 2013- 9:18 am Usama- Please refer to LEED Interpretation ID #10265- http://www.usgbc.org/leed-interpretations?keys=10265- for additional information on construction waste on a site with multiple projects. This LI is referenced and discussed under the FAQs on this forum- http://www.leeduser.com/credit/NC-2009/MRc2. Log in or register to post comments Usama Eita LEEDuser Basic Member 4 thumbs up November 30, 2013- 7:06 pm Thanks Michelle, your reply so rich and useful for me. Log in or register to post comments ...

Last reply: Usama Eita, Nov 30, 2013, 7:06 pm

Classify Buried Rubble Excavated During New Build

NC-v2.2 MRc2: Construction Waste Management
posted by Lindsey Kindrat on Sep 12, 2012, 4:25 pm

Ideas LLC LEEDuser Expert 613 thumbs up November 11, 2013- 12:08 pm Emily- I can't speak to the content of the GA exam but I would think that a rusty pipe is not landclearing debris (see MRc2 forum...

Last reply: Michelle Reott, Nov 11, 2013, 12:08 pm

Documentation required for commingled waste

NC-v2.2 MRc2: Construction Waste Management
posted by Lee Kellogg on Oct 25, 2013, 3:36 pm

Michelle Reott Managing Principal, Earthly Ideas LLC LEEDuser Expert 613 thumbs up October 28, 2013- 10:49 am Lee- Did you post this in the right forum? It seems like you are asking about LEED 2009 documentation- http://www.leeduser.com/rating-systems/NC-2009/leed-new-construction-2009- as its form has a Total Waste column and the template for LEED-NC v2.2 does not. Regardless, no- you would not leave the Total Waste column blank. This is where the quantity of waste (landfilled or diverted) would be entered. I typically total up all of the same materials for the entire job and enter that total on the form-...

Last reply: Michelle Reott, Oct 28, 2013, 10:49 am

NC-v2.2 MRc2 vs. NC-2009 MRc2

NC-v2.2 MRc2: Construction Waste Management
posted by Monica Feghali on Aug 29, 2013, 1:36 am

What is the difference between NC-v2.2 MRc2 and NC-2009 MRc2.

Also is the Waste management Plan is to be submitted as a requirement to get the construction waste Management Credit for...

Last reply: Michelle Reott, Sep 3, 2013, 10:01 am

Construction Waste Management (Material & Resources: Credit 2)

NC-v2.2 MRc2: Construction Waste Management
posted by Prabhu Jaysingh on May 19, 2013, 9:14 am

Michelle Reott Managing Principal, Earthly Ideas LLC LEEDuser Expert 613 thumbs up May 20, 2013- 4:20 pm If the reviewer is asking for the information, then I would provide it. We’ve gone around on the food waste issue on this forum- http://www.leeduser.com/credit/NC-2009/MRc2?all-comments=true#comment-2849- and although it is not specifically called out anywhere, this credit is supposed to document non-hazardous waste leaving the site so we have noted it should be included. It is also listed in the FAQs on that forum but as a guest you can't see them. Log in or register to post comments ...

Last reply: Michelle Reott, May 20, 2013, 4:20 pm

Confirmation from recycling companied

NC-v2.2 MRc2: Construction Waste Management
posted by Sustainability Consultant on Apr 16, 2013, 7:14 am

Is it required to submit 'confirmation' (from waste recycling companies) that they would recycle the waste received. Does this confirmation/ documented proof required to be uploaded to LEED...

Last reply: Michelle Reott, Apr 16, 2013, 10:12 am

CWM from Demolition- Donations

NC-v2.2 MRc2: Construction Waste Management
posted by Peggy White on Mar 4, 2013, 10:57 pm

Hello

If our project includes donations of furniture items from building demolition in the calculations for Construction Waste Management, does that translate into having to include new...

Last reply: Michelle Reott, Mar 6, 2013, 6:31 pm

Demolition of an existing building

NC-v2.2 MRc2: Construction Waste Management
posted by Florinda Garcia on Feb 20, 2013, 7:27 pm

Should i have to incluye the demolition waste of an existing building in a leed projet? Or the projet counts since a clean site?

Last reply: Michelle Reott, Feb 21, 2013, 10:15 am