Forum » Schools-2009 MRc1.2
Topic | Recent |
---|---|
Double trouble with ceilingsSchools-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by Cynthia Kaplan on Jul 23, 2015, 3:00 pm
Our school project is retaining nearly all of the original plaster ceilings. We are, however, removing the suspended ceilings that were installed in the 1970's, just below the plaster ceilings.... Last reply: Tristan Roberts, Nov 24, 2015, 9:40 pm |
|
Non-structural wall resurfacingSchools-2009 MRc1.2: Building reuse - maintain interior nonstructural elementsposted by James Ketter on Mar 16, 2011, 1:01 pm
Our project has existing non-structural plaster walls that will be reused in place. The current design calls for touch up of existing plaster walls, but the owner is also contemplating full skip-... Last reply: Tristan Roberts, Mar 29, 2011, 9:45 am |