Forum quick links
Occupancy before building is finished
NC-2009 PIf4:Schedule and Overview Documentsposted by Victoria Rios Esteve on
Hi everyone! Im pretty sure this question is not rightly set in this category, but here we go...
Utility Trenches Part of Project Boundary?
NC-2009 PIf4:Schedule and Overview Documentsposted by Larry Turbes on
We're certifying a school addition and the site area associated is fairly straight forward except we have both power and sanitary utility connections that finger out beyond what would be a reasonab
Uploaded drawings
NC-2009 PIf4:Schedule and Overview Documentsposted by Michael Beattie on
I've been waiting to upload the drawings for our project until the revisions generated by Owner and Contractor have been complete, and the drawings reflect what's actually being constructed.
Plf4 - upload L-4 & Plf4-3
NC-2009 PIf4:Schedule and Overview Documentsposted by Matt Dem on
What is specifically meant with " mechanical plans and / or drawings " for L-4 ? I think it is definitely floor plan layout but what about details ? Is the details sheet also needed ?
Project Mexico
NC-2009 PIf4:Schedule and Overview Documentsposted by Alejandro Macias on
I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .
Submitted drawings
NC-2009 PIf4:Schedule and Overview Documentsposted by Ashley Sadowski on
I have a general question regarding submitted drawings. We are at 100% DD's and wanted to create the documentation for the sustainable sites criteria.
P1 Form 4 Core and Shell Scope Upload L-6
NC-2009 PIf4:Schedule and Overview Documentsposted by Phil Meyer on
I have a question regarding appropriate document types for Upload L-6. The developer intends to achieve LEED credits for the building based on tenant cooperation/compliance.
Appealing period.
NC-2009 PIf4:Schedule and Overview Documentsposted by Jatuwat Varodompun on
Does the announced holidays of GBCI from 25 feb 2012-1 fan 2013 count as holidays and will not be included in 25 bussiness days of appealing preriod? thanks
PLF4 was not approved because ..& recommendation for final submi
NC-2009 PIf4:Schedule and Overview Documentsposted by Matt Dem on
Plf4 was not approved because GBCI is asking int & ext photos & renderings of the building. This was Design Preliminary submission and construction has just started.
Translation to american english
NC-2009 PIf4:Schedule and Overview Documentsposted by Alicia Villanueva on
Is it mandatory to translate the mechanical drawings to american english. The project is originally designed in spanish. GH