Forum quick links
Historical Exemptions from Requirements
Pilot-Credits PC14:Walkable Streetsposted by Qiongwen Kong on
Has anyone had any experience with an exemption to a requirement due to a historical building or feature? This is regarding the requirement that no more than 30% of the primary façade can be witho
Safe pedestrian access to the building please!
Pilot-Credits PC14:Walkable Streetsposted by Maria Porter on
I would like to see this credit evolve to include pedestrian access to the building. Most cities in my country are very pedestrian oriented and can comply with this credit´s requirements.
Schools project - large playing fields and open area
Pilot-Credits PC14:Walkable Streetsposted by Helen Kessler on
Would a project with large playing fields and open area have any possibility of meeting this credit requirement?
biking line
Pilot-Credits PC14:Walkable Streetsposted by Lily Li on
The building is parallel to the street, cross street it's a biking line, can this still count towards the credit, please advise.
Sidewalk definition
Pilot-Credits PC14:Walkable Streetsposted by Jens Apel on
How would the sidewalk length for the category "Sidewalk Intrusions" be measured for a project consisting of several buildings on a plaza. There are no defined sidewalks and nor driveways on the pl
Street trees
Pilot-Credits PC14:Walkable Streetsposted by Florian Schmidtchen on
How is distance between street trees measured? From center to center or from the border of the crown to the next crown border?
pc14 for Historic School building in urban context
Pilot-Credits PC14:Walkable Streetsposted by Kristian Whitsett on
We were inspired to test out this credit because of the huge increase in students walking to school after we completed a full renovation of a historic school in North Adams, MA.
Campus Project
Pilot-Credits PC14:Walkable Streetsposted by Sara Goenner Curlee on
I have a campus project in Wisconsin. University projects are generally walkable and try to continue a very pedestrian orientated feel.
Walkable Streets - Historic
Pilot-Credits PC14:Walkable Streetsposted by Pat Thomas on
Our project is an adaptive reuse of a historic building in a historic district.
Repealed?
Pilot-Credits PC14:Walkable Streetsposted by Kath Williams on
If a pilot credit is repealed (under Resources, it says March 2013), does that mean a project can not submit this credit even if the project is registered for the credit?