Log in
Forum
Topic

Existing Parking Lot

NC-v4.1 MPR2: Must use reasonable LEED boundaries
posted by Laura Soma on Dec 5, 2023, 12:55 pm

If building next to an existing parking lot, which will serve the new...

Last reply: Dave Hubka, Dec 6, 2023, 3:43 pm

Project phases vs LEED certification approach?

LEED Guidance for Campuses and Multiple Buildings
posted by Ehsan Baharvand on Jul 10, 2016, 3:27 am

Dear all,

I'm wondering what certification approach I can propose for a poduction site consisting of 3 construction phases (like building extensions over different period of time):
...

Last reply: Dave Hubka, Dec 6, 2023, 3:31 pm

Energy Metering Displays

NC-v4 EAc3: Advanced Energy Metering
posted by Allison Para on Dec 5, 2023, 12:33 pm

Hello Pros,

I am working on a student residential building (NC) that will have advanced submetering for the 5 floors.

The accountable submetering consumption is for each floor, not...

Last reply: Allison Para, Dec 5, 2023, 3:07 pm

Documentation for Inherently non-emitting materials

NC-v4 EQc2: Low-emitting materials
posted by Edgar Arevalo on Sep 29, 2023, 11:46 am

We have an insulation material that can comply either as inherently non-emitting or meets general emissions evaluation, and has been checked as inherently non-emitting by the contractor, but no...

Last reply: Dave Hubka, Dec 4, 2023, 5:05 pm

Electric vehicle charging station used in demand response strategy

NC-v4 EAc4: Demand response
posted by Martina Salonen on Aug 24, 2018, 9:14 am

vehicle is getting quite common for the demand response programs here, but since I found no mention of this anywhere in the LEED manual nor forum, I wanted to confirm that it is acceptable strategy...

Last reply: Marcus Sheffer, Dec 4, 2023, 3:41 pm

Innovation: PBT source reduction- lead, cadmium and copper

NC-v4 INc1: Innovation
posted by David Dixon on Oct 27, 2017, 11:57 am

the credit does not allow for lead in roofing or flashing.

almost all steel is recycled and the companies report minor lead in the material due to the recycled materials - the one we are...

Last reply: Ann Busker, Dec 4, 2023, 10:23 am

Healthcare-v4.1 MRc6: PBT Source Reduction- Lead, Cadmium, and Copper

Healthcare-v4.1 INc1: Innovation
posted by Ann Busker on Feb 10, 2022, 12:38 pm

Good morning, 

I am looking for examples to send my Plumbing and Electrcial Subcontractors to explain thier process for copper pipe joints and recycling the electrical wires containing...

Last reply: Ann Busker, Dec 4, 2023, 9:50 am

How can a warehouse extension project (with no regularly occupied space) comply with EQp1?

Warehouses-NC-v4 EQp1: Minimum indoor air quality performance
posted by Blake Jackson on Dec 1, 2023, 2:33 pm

I'm working on a 455,000gsf expansion of an existing facility, which will have all new/standalone systems to support the new wing. The existing facility won't be impacted, spare for the...

Last reply: Dave Hubka, Dec 4, 2023, 9:26 am

Increased Ventilation 15% and 30%- does it count as 2 strategies?

CI-v4.1 EQc1: Enhanced indoor air quality strategies
posted by Lidia Johansen on Dec 2, 2023, 7:36 am

Hello

If we achieve increased ventilation by 30% - does it count as 2 strategies (15% and 30%)?

Thanks

Lidia

LEED certification for open spaces

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Sergio Acevedo on Dec 1, 2023, 3:34 pm

We would like our expansion project to be LEED certified.

There will be no physical separation between the existing building and the extension (no walls).

In fact, the space will be...