Log in
Forum
Topic

Onsite Carbon Sequestration Through Plantings- Pilot credits- SSpc158

LEED v4.1 Discussion Forum
posted by Evan Constant on Nov 18, 2022, 5:39 pm

Option 1 for the Onsite Carbon Sequestration Through Plantings pilot credit requires showing the amount of CO2 sequestered...

Last reply: Thomas Lagarde, Sep 20, 2024, 10:03 am

Proposed Building's HVAC system

CS-2009 EAp2: Minimum Energy Performance
posted by Luis Andrade on Jun 22, 2018, 9:42 am

Hi everyone,

I'm modeling an office building under LEED CS v2009. The scope of C&S includes a centralized cooling and heating system (air cooled chilers and heat pumps), ventilation...

Last reply: Manuel Romera Molina, Sep 20, 2024, 5:27 am

Connected Functionality Criteria

NC-v4.1 LTc8: Electric Vehicles
posted by Rebecca Hatchadorian on Jul 12, 2023, 1:53 pm

Can anyone give me a better understanding of the "Connected Functionality Criteria" requirement? In my understanding, the EVSE needs to be capable of responding/communicating with the local...

Last reply: Beatriz Aruth Sturm, Sep 19, 2024, 12:43 pm

How to show the GHG Emission calculation for the new Energy update

CI-v4 EAp2: Minimum Energy Performance
posted by Nagaraj Sankar on Sep 12, 2024, 3:37 pm

Dear Kudos,

One of our LEED V4 ID+C: CI projects has been registered following the new energy update (effective after April 2024). As per the updated requirements, we are required to...

Last reply: Tyler Thumma, Sep 19, 2024, 8:54 am

LEED Water Side Calculator for DES1

NC-v4 EAp2: Minimum Energy Performance
posted by elvin ruya on Sep 12, 2024, 5:06 pm

Hi,

I was wondering if anyone knows the requirements for the secondary pump controls under the...

Last reply: Tyler Thumma, Sep 19, 2024, 8:24 am

REACH Optimization

NC-v4 MRc4: Building product disclosure and optimization - material ingredients
posted by Sandra Moran on Jan 23, 2018, 9:52 am

Project is N America (outside USA). Manufacturer is Europe HQ with global operations; uses European standards for global manufacturing. Materials will be produced in USA/ shipped to project...

Last reply: Josef Andersen, Sep 19, 2024, 5:33 am

Excluding spaces from the project's LEED Boundary

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by Nadia Azzam on May 18, 2023, 4:34 pm

Hello, 

We are currently designing office space that will occupy a portion of the 1st level and the entire 3rd level of a building, with a staircase connecting the...

Last reply: Andrey Kuznetsov, Sep 18, 2024, 10:42 pm

Building reuse plus addition

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Erica Downs on Sep 1, 2021, 5:34 pm

Can someone please clarify if the entire project (including additions) is used as the "denominator" for this credit?  Or only the existing building that is being resused?  I am finding the credit...

Last reply: Lorax Partnerships, Sep 18, 2024, 4:31 pm

Reheating more than 30% at the VAV

NC-v4 EAp2: Minimum Energy Performance
posted by Dave Hubka on Sep 17, 2024, 12:29 pm

I am becoming involved with a project that is being designed to reheat more than 30% of the max cooling airflow rate at the...

Last reply: Dave Hubka, Sep 18, 2024, 11:28 am

What Documentation- Specs or Submittals? Cadmium and Lead Paint still an issue for NEW Paint?

Healthcare-v4 MRc6: PBT source reduction - lead, cadmium and copper
posted by Heather Ane Zeto on Sep 18, 2024, 10:18 am

2 questions in 1!
What documentation are you uploading to meet the credit requirements?

  • The Credit Language reads "Specify..." for so many of the requirements.
    • This...