Requirements to meet CO2 monitoring

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Lise Dannesboe on Apr 26, 2019, 8:42 am

Hi All

Hope someone can specify the following. When the credit requires "Provide a control drawing sample showing the...

Last reply: David Posada, Aug 16, 2019, 7:11 pm

Option 1 shared multi-occupant spaces

EBOM-v4 EQc4: Interior lighting
posted by Simon S. on Jul 30, 2019, 11:26 pm

Hi ALL,

According to EQc4 requirements, all shared multi-occupant spaces have to meet "Have in place multizone control systems that enable occupants to adjust the lighting to meet group...

Last reply: David Scheer, Aug 16, 2019, 2:01 pm

NAF Composites Not CARB

NC-v4 EQc2: Low emitting materials
posted by Michelle Rosenberger on Aug 16, 2019, 12:54 pm

There are particleboard products that are NAF with third party certifications that LEED reviewers will not accept because they do not have a CARB exempt executive order. I have asked reviewers to...

Last reply: Michelle Rosenberger, Aug 16, 2019, 2:01 pm

Garage Roll-Up Doors for Daylighting

NC-v4 EQc7: Daylight
posted by Abhinay Sharma on Aug 12, 2019, 7:59 pm

Hello,

I am modeling a plant that has regularly occupied spaces classified as work spaces. These spaces have little to no windows which hurts overall...

Last reply: David Scheer, Aug 16, 2019, 1:50 pm

Demand Response Plan- who creates the plan?

NC-v4 EAc4: Demand response
posted by Deborah Lucking on Aug 15, 2019, 5:32 pm

We have a mechanical engineer, an electrical engineer, a...

Last reply: David Hubka, Aug 16, 2019, 12:40 pm

Composite Wood Doors

NC-v4.1 EQc2: Low-emitting materials
posted by Katie Breshears on Aug 15, 2019, 3:59 pm

The credit language states that the composite...

Appeal for denied credit

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Johnathan Woodside on May 4, 2015, 3:01 pm

If a project has been submitted for review (Design prelim and Construction prelim) comments are received for each review. Upon returning comments from the second review, will the corrections made...

Last reply: Marcus Sheffer, Aug 15, 2019, 3:24 pm

Adding Green Energy points after final construction review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Susan Di Giulio on Aug 15, 2019, 2:48 pm

So we have a difficult v2009 project that strained to achieve simple certification. It came back from prelim construction review with only one comment. The credit in question is worth 2 points...

Last reply: Marcus Sheffer, Aug 15, 2019, 3:02 pm

PV Lease Agreement Clarification

NC-v4 EAc5: Renewable energy production
posted by Jeff Ross-Bain, PE, LEED Fellow on Aug 14, 2019, 1:07 pm

Our project intends to provide land, under a min. 10-year lease, to the local power provider who will install a min. 1MW PV system. The power provider will own the PV system and the Owner has the...

Last reply: Marcus Sheffer, Aug 15, 2019, 2:46 pm

Commissioning Fees

NC-v4 EAc1: Enhanced Commissioning
posted by Tom Grassi on Aug 13, 2019, 10:57 am

I am looking for updated studies with cost data for LEED v4 Commissioning services, including Enhanced, Envelope and Monitoring-Based Commissioning.  "The Cost of LEED v4" is a good publication,...

Last reply: Tom Grassi, Aug 15, 2019, 2:43 pm