Log in
Forum
Loading...
Topic

Where to look for manufacturer documentation

NC-v4 EQc2: Low emitting materials
posted by Lissa Spitz on Dec 10, 2019, 11:23 am

Is it just me?  I'm having a hard time finding manufacturer documentation that confirms compliance with CDPH, aqBB, etc. Most of them still indicate...

Last reply: Martha Norbeck, Dec 10, 2019, 2:38 pm

Space Usage Calculator- Lease Type?????

CS-2009 PIf3: Occupant and Usage Data
posted by Edgar Arevalo on Dec 10, 2019, 1:57 pm

What does LEED/USGBC define as net and gross lease type??  I have no prior knowledge of the difference between either lease types, and yet the space usage calculator has that column which I need...

Form (v01) Tab

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Christina Quilter on Dec 9, 2019, 10:13 pm

Summer Minchew Managing Partner Ecoimpact Consulting LEEDuser Expert 69 thumbs up December 10, 2019- 7:55 am It could be a web browser issue. I have the most luck accessing LEEDonline with Internet Explorer. Log in or register to post comments Emily Purcell Green Building Specialist Solomon Cordwell Buenz LEEDuser Basic Member 99 thumbs up December 10, 2019- 9:59 am There are a couple threads in the "navigating LEED Online" forum that should help. For LEED Online assistance I've had the most luck using the "feedback" button in the bottom corner, that goes straight to technical support...

Last reply: Christina Quilter, Dec 10, 2019, 1:35 pm

Anyone been through full review of this credit yet?

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Joanna Switzer on Oct 26, 2017, 2:57 pm

Just curious if anyone has lessons learned on this one yet?

I am researching feasibility/ realistic attainability of this credit. I noticed Sherwin Williams has created some...

Last reply: Maria Fiorelli, Dec 10, 2019, 12:29 pm

Exterior Lighting control for 24x7 operating building

NC-v4 EAp2: Minimum Energy Performance
posted by Rathnashree Bharadwaj on Jul 27, 2018, 2:28 am

We have a commercial building which is 24x7 operating. How do we comply with the 9.4.1.7 b., 9.4.1.7c requirements when the building does not have any business closing or business opening hours...

Last reply: Waleed AlGhamdi, Dec 10, 2019, 11:22 am

Bird Collision Deterrence – Performance Monitoring Plan

NC-v4 INc1: Innovation
posted by Verde Design on Dec 10, 2019, 10:49 am

I am currently developing a performance monitoring plan for the Bird Collision Deterrence Pilot Credit and have a couple of questions:

  1. The credit requirements states "List potential...

PPB to UG/M3 in ArcSkoru

EBOM-v4.1 EQc1: Indoor Environmental Quality Performance
posted by Angela A. Moore on Dec 9, 2019, 3:06 pm

Reporting...

Unsolved adobe reader issue after following instructions

Living with LEED Online - quirks, bugs and hiccups
posted by Nicolas Galiotto on Feb 19, 2012, 4:42 pm

Hi there,
I'm on Windows 7. Both Adobe pro and Adobe 10.1.2 were on my computer. Since I still didin't have access to the LEED Online forms, I switched from Internet Explorer 9 to the 8,...

Last reply: Jenny Fox, Dec 10, 2019, 2:02 am

Default Emissions Factors & Carbon vs Electricity

CI-v4 EAc6: Green power and carbon offsets
posted by Tracy Marquis on Mar 10, 2019, 10:47 am

I have two questions.  

  1. Can you please confirm that Scope 1 Emissions can ONLY be offset by Carbon Offsets.  As such, one cannot achieve 2 points (100%) using...

Last reply: Reshadee Weerasooriya, Dec 9, 2019, 10:10 pm

Unenclosed Buildings & LEED

LEED Rating System Selection
posted by Keith Yzquierdo on Dec 4, 2019, 8:54 am

What, if anything, precludes a completely unenclosed building from achieving a LEED certification? Imagine a stand-alone pavilion, band shell, or amphitheater on its own plot of land. These are...

Last reply: David Posada, Dec 9, 2019, 7:38 pm