Topic

Process or non-process? Kitchen Hood Exhaust and Makeup Air

NC-2009 EAp2: Minimum Energy Performance
posted by Matt Scott on Feb 4, 2015, 2:51 pm

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5555 thumbs up February 4, 2015- 5:18 pm I think I answered this a bit ago in one of these forums. As I recall when the hood is make up air and exhaust without any space conditioning then it is process. When the hood includes some space conditioning that serves the space surrounding the hood then it is not process. Log in or register to post comments Matt Scott Engineer N.E. Fisher & Associates, Inc. LEEDuser Basic Member 18 thumbs up February 5, 2015- 8:55 am So even if the makeup air is heated, it's still considered...

Last reply: Robin Dukelow, Nov 11, 2019, 6:47 pm

CAS Number

NC-v4 MRc4: Building product disclosure and optimization - material ingredients
posted by Samantha Lee on Nov 11, 2019, 2:17 pm

I have two questions about MRc4- Material Ingredients. Is a CASRN the same thing as CAS Number? Also, has anyone used the CAS number from a SDS as credit compliance for this credit?

Last reply: Samantha Lee, Nov 11, 2019, 2:19 pm

Reduce Parking Footprint

NC-v4 LTc7: Reduced parking footprint
posted by Hadar Farjo on Sep 22, 2016, 3:06 pm

LT Credit : Reduced parking Foot print
Can this credit be achieved if there are no parking spaces provided and we are using existing parking lot for the new building?

Last reply: David Posada, Nov 11, 2019, 12:59 pm

T-shaped Space Alternative?

Pilot-Credits INpc125: Inclusive Design
posted by Kristi Ennis on Nov 8, 2019, 4:31 pm

#1 Physical Access proposes that the size of the turning space be increased to a 6' diameter (in lieu of 5'). Has there been any discussion about the size of an alternative T-shaped turning space...

Last reply: Emily Purcell, Nov 11, 2019, 10:37 am

Group certification- calculating and placing bike racks

CS-v4 LTc6: Bicycle facilities
posted by Barbora Cicvárková on Nov 7, 2019, 10:03 am

Hi all,

we are pursuing group certification for project with 5 separated above ground buildings (section A,B,C,D,E) connected with underground parking garages.

Each section has...

Last reply: Barbora Cicvárková, Nov 11, 2019, 7:20 am

Can mixed paper and corrugated cardboard be collected and stored together?

CS-v4 MRp1: Storage and Collection of Recyclables
posted by Erkki Seinre on Oct 28, 2019, 7:31 am

According to this prerequisite, the project should have dedicated areas for the collection and storage of...

Last reply: Erkki Seinre, Nov 11, 2019, 4:19 am

VOC compliance and Lab Test Reports

NC-v4 EQc2: Low emitting materials
posted by Samantha Lee on Oct 6, 2019, 11:44 am

Hi everybody.

I am working on a LEEDv4 NC project and have been asked to provide Product Data that shows...

Last reply: Reinhard Oppl, Nov 10, 2019, 1:05 pm

Task Lighting for Ergonomics?

Pilot-Credits EQpc44: Ergonomics approach for computer users
posted by Kristi Ennis on Nov 8, 2019, 3:57 pm

We are wondering if there is any research indicating that task lights with articulating arms are beneficial to proper ergonomics. Has anyone seen anything on this?

Vegetated Roof and Roof Planters

CS-v4 SSc5: Heat Island Reduction
posted by Lou Niles II on Nov 8, 2019, 2:22 pm

We have a project with a Roof / Terrace space. This space has turf areas and also some Planters; along with the walkable "pavers" and concrete areas. There are also some shade Structures on this...

O+M Table of Contents requirement for v4 Fundamental commisioning

CI-v4 EAp1: Fundamental commissioning and verification
posted by Robert Fernandez on Nov 8, 2019, 2:21 pm

I provided our primary LEED review with all of the following individually as each has its own upload to meet the intent of the credit but am being requested for an O+M table of contents for...