4026 search results for "zero lot line"
Topic | Recent |
---|---|
water leak detection pilot credit?CS-v4 WEp2: Indoor water use reductionposted by Sareet Benayahu on Apr 14, 2021, 2:47 amLEEDuser Expert 475 thumbs up September 2, 2024- 6:15 pm There's not a whole lot of traffic for this Pilot credit, but you may want to try posting on the dedicated page for it: ... Last reply: Julio Fernandez Amodia, Sep 25, 2024, 3:04 am |
|
Soil tests no longer required?NC-v4.1 SSc2: Protect or Restore Habitatposted by Petra Holoubkova on Jan 4, 2022, 8:07 amHello, the current credit wording, changed by ID#100002460 https://www.usgbc.org/leedaddenda/100002460, states under 2. Step-by-step Guidance that "Soil tests are only required for imported soils" however just few lines below under 4. Required documentation, the bullet point states "No longer required: Soil test results". I am a bit confused as this seems a bit contradictory..any thoughts on this? Thanks for leaving any comments. SSc2 ... Last reply: Grace Heraly, Apr 25, 2022, 2:04 pm |
|
Native plants = No Irrigation Required?NC-v4 WEc1: Outdoor water use reductionposted by Yoyo Shek on Jan 24, 2022, 6:40 amHi All, Noted in the Step-by-Step Guidance, Step 2. Option 1. saying that: A landscaping plan showing native plants may be provided to confirm that irrigation will not be required, based on local rainfall and plants’ water demands. So, does it mean GBCI would accept a landscaping plan having all plants native require no irrigation after establisment period? Under the premise that the landscaping area is "rain reachable". And no calculation is needed? Thanks a lot! WEc1 ... Last reply: Andrey Kuznetsov, May 26, 2024, 1:16 am |
|
Landscape in ground mounting- backlight exempt?NC-v4 SSc6: Light Pollution Reductionposted by Sue Bryant on Mar 3, 2022, 10:49 amSwanson Sr. Electrical Engineer Integrated Design Solutions LEEDuser Expert 734 thumbs up March 3, 2022- 2:37 pm BUG ratings are designed for light fixtures that are aimed down. Zero degrees nadir. ... Last reply: Ulises Sloan, May 21, 2022, 3:21 pm |
|
Skipping the IAQ Assessment for CO2 and TVOCEBOM-v4.1 EQp4: Indoor Environmental Quality Performanceposted by Maysoon Al-Khuraissat on Apr 28, 2022, 9:04 amPoland LEEDuser Basic Member January 10, 2023- 5:16 am Thanks, that helped a lot! Log in or register to post comments Robert Cashins LEEDuser Basic Member May 4, 2023- 5:14 pm The information provided... Last reply: Robert Cashins, May 4, 2023, 5:14 pm |
|
Standard for the baseline of the cold storage in a factoryNC-v4.1 EAp2: Minimum Energy Performanceposted by Michael on Sep 11, 2022, 1:40 pmup September 12, 2024- 1:01 pm Thanks a lot! Unfortunately within the IACSC 2013 guide for refrigerated facilities we can't figure out exactly how to modell the baseline cooling system, so we have... Last reply: Marcus Sheffer, Sep 12, 2024, 1:49 pm |
|
Enhanced Refrigerant Management- Non-regular RefrigerantNC-v4 EAc6: Enhanced Refrigerant Managementposted by Song Zhang on Nov 18, 2022, 10:37 amMember November 18, 2022- 11:30 am Hi Bipin, Thanks a lot for your quick response. It looks like that I need to provide the LCGWP and LCODP hand calculations in addition to filling out the LEED form.... Last reply: Bipin Karki, Aug 6, 2024, 1:22 pm |
|
WWR allowancesNC-v4 EAp2: Minimum Energy Performanceposted by Julio Fernandez Amodia on Nov 24, 2022, 2:39 amBut as said before, it can be done at a not so large a penalty as in the past decades. Bottom line is, it can be done if done correctly, but Im not a fan of glass buildings and in hot climates, I dont see... Last reply: Julio Fernandez Amodia, Nov 24, 2022, 1:19 pm |
|
Recycle content for Ready Mix concreteNC-v4 MRc3: Building product disclosure and optimization - sourcing of raw materialsposted by Osman Faroq on Jun 8, 2023, 7:46 amif you have a mix that is 3% by weight fly ash, and cost $100,000, you would just enter it as concrete, $100,000, 3% pre-consumer recycled content. If you did have the line item cost, you could also enter... Last reply: Afogreen Build, Jul 25, 2023, 5:34 am |
|
Building Entrance Vestibule RequirementsNC-v4 EAp2: Minimum Energy Performanceposted by Christopher Russell-King on Jun 12, 2023, 12:36 pmfor workers only from the parking lot and the ground floor are building entrances that should comply. The terrace doors are not building entrances. The definition- "building entrance: any doorway, set... Last reply: Marcus Sheffer, Nov 27, 2023, 11:53 am |