Log in

4026 search results for "zero lot line"

Forum
Topic

Definition of main entrance

NC-v4 LTc6: Bicycle facilities
posted by ABDUL MUTHALIB MOHAMED on Sep 21, 2016, 12:24 am

lot? Can it count as main entrance? Log in or register to post comments Jose Romo LEEDuser Basic Member 1 thumbs up April 30, 2020- 11:06 am Hi Mariana, Short-term bycicle storage can be located less...

Last reply: Jose Romo, Apr 30, 2020, 11:06 am

Data sets must be compliant with ISO 14044

NC-v4 MRc1: Building life-cycle impact reduction
posted by Dionisio Franca on Oct 11, 2016, 3:47 am

In — a "non-zero" data value that is explained, — a "zero" data value if explained, or — a calculated value based on the reported values from unit processes employing similar technology. Data quality should...

Last reply: Jennifer O'Connor, Oct 12, 2016, 3:14 pm

Inherently Non-Emitting vs. Zero VOCs

NC-v4 EQc2: Low-emitting materials
posted by Michelle Rosenberger on Jun 27, 2016, 11:58 am

in that is has been classified as a known human carcinogen. CDPH standard method is more than just TVOC. The TVOC range is a point of information in addition to the general emissions evaluation. Zero VOC...

Last reply: Amanda Lang, Feb 7, 2020, 11:34 am

Entrance vestibules and stairs

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Dionisio Franca on Nov 1, 2016, 5:14 am

Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C Founder and Principal USL Technology Inc. LEEDuser Premium Member 3 thumbs up February 4, 2019- 3:48 pm Hi could someone please help with an answer to the above? I will re-copy for ease. Thank you. Do vestibules at the entrance of buildings require mechanical ventilation? As those spaces have lots of air exchange with the outdoors when people enter or leave the building, it seems to me that ventilation is not necessary. Second question: Do interior stairs require ventilation?...

Last reply: Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C, Feb 4, 2019, 6:31 pm

Is compliant SRI paint enough?

NC-2009 SSc7.2: Heat island effect - roof
posted by Raymond Salfiti on Dec 9, 2016, 12:37 pm

Charles Nepps NH Green Consulting LEEDuser Premium Member 97 thumbs up December 9, 2016- 1:31 pm The assumption you made: the paint is compliant, therefore whatever you paint will be compliant, is not unreasonable, or that uncommon. However, the texture of the surface has a lot of impact on the SRI value. For example a irregular surface can actually cast shadows on itself and reduce the overall SRI value.You'll need to contact the paint manufacturer and find out which material(s) they tested the paint on and hope that those match the materials you painted. If not, you may need to have additional testing...

Last reply: Summer Minchew, May 18, 2017, 10:36 am

2007 versus 2010 ASHRAE forms

CI-2009 EAp2: Minimum Energy Performance
posted by Denise Dauplaise on Feb 15, 2017, 4:30 pm

not have enough lines? Log in or register to post comments Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up November 8, 2018- 2:17 pm Denise- sorry I missed this a long...

Last reply: Marcus Sheffer, Nov 8, 2018, 2:18 pm

Homes v4, EA, Home Size, positive and negative points?

Homes-v4 EAp4: Home size
posted by Gary Wheeler on Mar 24, 2017, 4:48 pm

On the Excel spreadsheet from LEED, there is no space to put either positive or netative points. The line is shown with a "Y" box, is listed as "prereq." and there is no space listing the number of points possible. Maybe I am using the wrong spreadsheet, mine is titled on the top "LEED v4 for Homes Design and Construction: Homes and Multifamily Lowrise". It has colored boxes of green, yellow and tan for the points areas. Maybe I should be using: LEED v4 for Homes Design and Construction Checklist.xlsx? I was reluctant to use the version with macros as I am using...

Last reply: Carissa Sawyer, Jan 16, 2019, 5:42 pm

Amtrak and Megabus

NC-v4 LTc5: Access to quality transit
posted by Sara Zoumbaris on Apr 10, 2017, 11:59 am

A lot of commuters in the DC area do take Amtrak from Baltimore/Philadelphia/Delaware even so I think you should be able to count it. Log in or register to post comments emily reese moody Sustainability...

Last reply: emily reese moody, Jan 16, 2018, 1:37 pm

Airflow monitoring in VAV systems

NC-v4 EQp1: Minimum indoor air quality performance
posted by Paula Rantanen on Apr 11, 2017, 3:35 am

Basic Member 6 thumbs up May 13, 2022- 5:35 am Hi Anne, thanks a lot for your fast response and confirmation. This makes a lot of things easier.  BR Chris Log in or register to post comments ...

Last reply: Christoph Keck, May 13, 2022, 5:35 am

IEQ 0 VOC General Emissions Test Needed?

NC-v4 EQc2: Low-emitting materials
posted by Jenelle Shapiro on Jun 15, 2017, 7:27 pm

issues formerly with Eurofins Product Testing A/S LEEDuser Basic Member 329 thumbs up July 12, 2018- 3:50 pm CDPH testing is not about VOC content. Zero VOC products still may contain traces of VOCs...

Last reply: Reinhard Oppl, Jul 12, 2018, 3:50 pm