4026 search results for "zero lot line"

Forum
Topic

Preferred parking FE vehicles and VIP parking

NC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehicles
posted by Maria Isabel Conde on Apr 21, 2016, 10:36 am

to the 2nd basement floor? Or LEED will not accept that VIPs are located as "more preferred" (on the upper basement level) than the majority of FE vehicles for standard parking lots? Thanks SSc4.3 ...

Last reply: Deborah Lucking, Oct 24, 2017, 12:51 pm

Cooling plant modeling

NC-2009 EAp2: Minimum Energy Performance
posted by Vassil Vassilev on Apr 28, 2016, 7:01 am

in or register to post comments Vassil Vassilev Manager Termoservice LEEDuser Basic Member 13 thumbs up April 29, 2016- 1:04 am Thnaks a lot for the reply. I assume that the same approach should be applied...

Last reply: Marcus Sheffer, Apr 29, 2016, 10:18 am

Campus approach

NC-2009 SSc4.1: Alternative transportation - public transportation access
posted by Febin Mohamed on May 5, 2016, 4:42 am

' LEED will accept the establishment of a permanent private shuttle bus to a place where there is direct access to rail or two or more bus lines' Can this be applied to a project going for Multiple Building approach? SSc4.1 Kuwait ...

Last reply: Marilyn Specht, Jul 5, 2016, 11:26 am

Definition of Assembly

NC-2009 MRc4: Recycled Content
posted by Martin Meehan on May 11, 2016, 12:04 pm

provide the cost of the cementitious materials separate from the cost of the aggregate. You could always try submitting the cost of the glass separately from the cost of the frame and have two line items...

Last reply: Martin Meehan, May 12, 2016, 4:10 am

WELL pricing

WELL v1 Building Standard Tip Sheet
posted by Tristan Roberts on Jun 1, 2016, 4:59 pm

then this conversation becomes a lot easier. Assembling the team seems to also be much more important for WELL than it is for LEED. The behavioral adjustments that are needed directly tie to "culture" which...

Last reply: Brian Salazar, Jun 28, 2016, 6:34 pm

Weekend trips frequency

NC-v4 LTc5: Access to quality transit
posted by Lourdes Salinas on Jun 7, 2016, 5:25 pm

Brightworks Sustainability Brightworks Sustainability LLC LEEDuser Premium Member 47 thumbs up July 21, 2017- 4:26 pm Lourdes, do the transportation lines not publicly post their schedules? If so, you could...

Last reply: emily reese moody, Apr 25, 2018, 2:16 pm

Measuring walking distance in L-shaped vestibule

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by Lyle Axelarris on Jul 20, 2016, 9:01 pm

honestly. We drew a dimension line from the door, then another one to follow the angle and the last one finished to the interior door. It was just three straight lines that included dimensions, following...

Last reply: Amari Roskelly, Jul 21, 2016, 4:04 pm

applicability of Watersense tool to commercial projects?

NC-v4 WEp1: Outdoor water use reduction
posted by Tristan Roberts on Jul 29, 2016, 12:19 pm

of the alternate strategies. The water sense calculator (as stated above) is for smaller lots where the calculator assumes will be very public and well viewed. Even if an owner states they will not irrigate...

Last reply: Tristan Roberts, Jan 17, 2017, 3:24 pm

Mandatory 18% energy saving after April 2016

NC-2009 EAc1: Optimize Energy Performance
posted by Indochine Engineering VN on Aug 9, 2016, 10:03 am

Marcus Sheffer LEED Fellow 7group / Energy Opportunities LEEDuser Expert 5903 thumbs up August 9, 2016- 10:14 am Yes. Log in or register to post comments Indochine Engineering VN Environmental Engineer, LEED AP BD+C LEEDuser Basic Member 10 thumbs up August 10, 2016- 3:55 am Thanks Marcus, that's a big challenge for my garment factory which uses evaporative cooling with cooling pad, and have a lot of process load. Basically, the proposed case ventilation has just fan and pump, no air conditioning system. What would the baseline be for my factory? Will the baseline be one of 8 systems...

Last reply: Marcus Sheffer, Aug 16, 2016, 11:16 am

postponing a construction credit

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Omar Elrawy on Sep 18, 2016, 9:21 am

56 thumbs up September 18, 2016- 10:50 am Thanks a lot Log in or register to post comments Lyle Axelarris Building Enclosure Consultant BPL Enclosure LEEDuser Basic Member 64 thumbs up September 29,...

Last reply: Sara Goenner Curlee, Sep 29, 2016, 2:01 pm